Pile Guide By Suntech Plus Engineering Limited,
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs.
Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Pile Guide
Next

Pile Guide

100 ~ 1000 / Piece

|

10 Piece Minimum Order

Pays:

China

N ° de modèle:

SUNTECH-P-001

Prix FOB:

100 ~ 1000 / Piece Obtenir le dernier prix

Localité:

China

Prix de commande minimale:

100 per Piece

Commande minimale:

10 Piece

Packaging Detail:

Pallet

Heure de livraison:

25 DAYS

Capacité de Fournir:

1000 Piece per Month

Payment Type:

L/C, T/T

Groupe de produits :

Contacter maintenant
Membre gratuit

Personne à contacter Mr. Peter

Guangming, Shenzhen, Guangdong

Contacter maintenant

Spécification du produit

  • pile guide:200
  • pile:2000

La description

Product Name:  Pile Guide

Main Material: Aluminum Alloy with Nylon Pulley Wheels.

Diameter: ******0mm/Customzed.

Installation: Screws

Function: Fasten and protection of Floating Pontoons.


Features:


1. Pile Guide is used to fix the pontoon to the pipes set into the seabed. They are made of ***1 T6  Aluminum Alloy and fixed to the pontoon by Stainless Steel Bolts.

2. Pile Guide will be fitted with high-resistance rubber rollers with Nylon Cores and Stainless Steel Shafts deigned to cushion the blows against the piles produced by the movement of the pontoons due to the sea swell.

3. The Pile Guide is not only reduces the noise but also the appearance of gaps and misalignment rought about as a result of the structure's continuous banging against the pipes.

4. Pile guide also include a rot-resistant tropical Rubber Fender to be fitted onto the pontoon.

Pays: China
N ° de modèle: SUNTECH-P-001
Prix FOB: 100 ~ 1000 / Piece Obtenir le dernier prix
Localité: China
Prix de commande minimale: 100 per Piece
Commande minimale: 10 Piece
Packaging Detail: Pallet
Heure de livraison: 25 DAYS
Capacité de Fournir: 1000 Piece per Month
Payment Type: L/C, T/T
Groupe de produits : floating pontoon

Send a direct inquiry to this supplier

To:

Mr. Peter < Suntech Plus Engineering Limited >

Je veux savoir: