Prix FOB
Obtenir le dernier prix|
1 Set Minimum Order
Pays:
China
N ° de modèle:
-
Prix FOB:
Localité:
-
Prix de commande minimale:
-
Commande minimale:
1 Set
Packaging Detail:
-
Heure de livraison:
within 15 days
Capacité de Fournir:
-
Payment Type:
T/T, L/C, Western Union
Groupe de produits :
China
Personne àcontacter Ms. leah
Wenzhou Bridge Industrial Zone, Wenzhou, Zhejiang
Our Transformer:
Â
1. Rated voltage:Â Â Â 6.3kV,*0kV,*1kV,*3.2kV,*3.8kV,*5kV, *0KV, *2KV, *3KV,*5KV
2. Rated capacity: 5kva ~ ****0kva
3. Stardard:Â Â Â Â Â Â Â Â Â Â IEC****6,GB********6;Â
4. Frequency:Â Â Â Â Â Â *0HZÂ /*0HZ
5. Vector group:   Dyn*1, Yyn0, Ynd*1, or others
6. Cooling:Â Â Â Â Â Â Â Â Â Â Â ONAN/Â ONAF/Â OFAF
Â
Â
About Our Company:
Â
1.  25 years' manufacturing experience with three subsidiaries
2. Won tenders aboard
3. IEC ****6 & ISO certificate
4. OEM / ODM
5. Competitive price with **0% Cu winding
6. Production capacity: *0,**0,**0 kVA per year
Â
Â
REFERENCES
Â
ISO ***1: Hot dip galvanized
coatings on fabricated iron and steel articles – Specifications and
test methods.
IEC ****6: Power
transformers.
IEC ****4: Instrument
transformers.
IEC ****6: Specification for unused
mineral insulating oil for transformers and switchgear.
IEC ****4: Loading guide for oil –
immersed power transformers.
IEC ****4: Tap-changers - Part 1:
Performance requirements and test methods, Part 2: Application
guide.
IEC ****2: Connectors for electronic
equipment.
Â
ROUTINE TEST to IEC ****6 (to be
done during acceptance testing at factory)
Â
• Measurement of winding
resistance
• Ratio test
• Vector group
• Separate source voltage withstand
test
• Induced over-voltage
• Insulation resistance
• Oil leakage test on fully
assembled transformer for *2 hours
• Measurement of impedance
voltage
• Magnetic balance
• Measurement of no-load loss and
current
• Measurement of load loss (at
normal & extreme taps)
• Tests on on-load
tap-changer
• Tests on on-load tap-changer
remote control panel
• Efficiency at *0%, *5%, **0%
loading at unity p.f and rated terminal voltage (Corrected to
*5C)
• Lightning impulse withstand
test
Â
Type Tests to IEC ****6 (to be
done during acceptance testing at factory)
Â
• Temperature rise test – To be
performed on one unit during acceptance testing.
Lightning Impulse Withstand Test is
already listed under Routine Tests as per IEC ****6.
Pays: | China |
N ° de modèle: | - |
Prix FOB: | Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | - |
Commande minimale: | 1 Set |
Packaging Detail: | - |
Heure de livraison: | within 15 days |
Capacité de Fournir: | - |
Payment Type: | T/T, L/C, Western Union |
Groupe de produits : | Power transformer |