Prix FOB
Obtenir le dernier prix1350 ~ 150000 / Set ( Negotiable )
|1 Set Minimum Order
Pays:
China
N ° de modèle:
6-325
Prix FOB:
1350 ~ 150000 / Set ( Negotiable )Obtenir le dernier prix
Localité:
China
Prix de commande minimale:
1350 per Set
Commande minimale:
1 Set
Packaging Detail:
in wooden case
Heure de livraison:
25 days
Capacité de Fournir:
50 Set per Month
Payment Type:
T/T, L/C
Groupe de produits :
Personne àcontacter Ms. Richard
Beihu Industrial Zone, Chenzhou, Hunan
Mould material, selected the most high-quality steel - Cr*2MoV with
reasonable molding design principle. After the high precision CNC
machining and air quenching and hardening treatment, the whole
hardness of the mould can reach HRC*4 °. Due to the reasonable
design, the precision of mould manufacturing and the advanced
technology in heat treatment, it’s very smooth in the production
process, with good stability and high efficiency. What’s more,
there is no strain or nail grain phenomena for the tube.
 Now, our company has brought in the new material *- high
aluminum bronze and high manganese bronze as the die material. The
new material possesses high rigidity and excellent wear resistance.
It can be molded in high precision by one time with no need to be
heat treated, while there is no deformation or magnetic
phenomenon.
 Our mould usually matches up our precision pipe-making
machine very well. There is no need to employ the professional
master to adjust the mould, which not only lets the enterprise have
the initiative in hands, but also greatly reduces the production
cost and improves the pipe-making efficiency.
Pays: | China |
N ° de modèle: | 6-325 |
Prix FOB: | 1350 ~ 150000 / Set ( Negotiable ) Obtenir le dernier prix |
Localité: | China |
Prix de commande minimale: | 1350 per Set |
Commande minimale: | 1 Set |
Packaging Detail: | in wooden case |
Heure de livraison: | 25 days |
Capacité de Fournir: | 50 Set per Month |
Payment Type: | T/T, L/C |
Groupe de produits : | moulds |