Prix FOB
Obtenir le dernier prix( Negotiable )
|1000 Set Minimum Order
Pays:
China
N ° de modèle:
KM15-1860
Prix FOB:
( Negotiable )Obtenir le dernier prix
Localité:
-
Prix de commande minimale:
-
Commande minimale:
1000 Set
Packaging Detail:
one sets into one polybag, then 25 sets into one carton box
Heure de livraison:
within 3 days after receiving your payment
Capacité de Fournir:
50000 Set per Week
Payment Type:
T/T, L/C, Western Union
Groupe de produits :
Personne àcontacter Lucy
Beijing, Beijing
1.      Product Introduction:
Prestressed tendons in anchorage installed in anchor cable steel strand) exposed and can be tensioned anchorage, after tensioning preload tension of the prestressed reinforcement can be passed to the surface of concrete or steel structure, increase the overall strength of the effect. Special analysis, tunnels, Bridges and other prestressed tensioning construction engineering.
2.      The performance parameters:
the diameter of the steel strand          *5.*4mm,*5.*0mm
the tensile strength of steel strand          ≤***0Mpa
The efficiency coefficientη                  ≥*5%
The assembly stress length of total strain  εapu ≥2.0%
pitch                                         *6mm
Execution standard                       GB/T *********7
3.      The unique features:
Anchor piece tooth type is reasonable, unique small damage degree of anchor cable surface, grasping the anchor cable is firm and reliable. Anchor for three disc, incision is bevel, and steel wire spiral to the contrary, more uniform distribution of steel strand monofilament passed the tensile force, anchor follow-up effect is good. Efficiency coefficient is high, safe and reliable support.
4.      packaging:
Kraft paper carton packaging, each anchorage is  independently encapsulated by plastic bags .
Pays: | China |
N ° de modèle: | KM15-1860 |
Prix FOB: | ( Negotiable ) Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | - |
Commande minimale: | 1000 Set |
Packaging Detail: | one sets into one polybag, then 25 sets into one carton box |
Heure de livraison: | within 3 days after receiving your payment |
Capacité de Fournir: | 50000 Set per Week |
Payment Type: | T/T, L/C, Western Union |
Groupe de produits : | Mining barrel and wedges |