Prix FOB
Obtenir le dernier prix|
450 Set Minimum Order
Pays:
China
N ° de modèle:
ZA-GYC-18
Prix FOB:
Localité:
China
Prix de commande minimale:
-
Commande minimale:
450 Set
Packaging Detail:
Steel parts in foam bag, wood parts in carton.
Heure de livraison:
Within 20 work days if one 20FT container.
Capacité de Fournir:
30000 Set per Month
Payment Type:
Other, Western Union, T/T
Groupe de produits :
-
Personne àcontacter Ms. Karen
Beidajie,old city,Luoyang,Henan,China, Luoyang, Henan
Metal bunk bed for hotel
1.School furniture manafacture
2.Use CNC machine
3.OEM is accept
Â
Name |
Metal bunk bed for hotel                |
Model |
ZA-GYC**8 Â Â Â Â Â Â Â |
Size  |
***0***0****0mm(L*W*H) Â |
Volume |
0.4m3 Â |
Weight |
*6Kg  |
Material |
1.The leg and the head of the bed is made of *0**0*1.5mm square  tube. 2.The tube is finished with gray epoxy power coating(non toxic). 3.Ladder use *9**9*1.5mm round tube,anti-skid footboard. 4.The rust of steel parts is removed by pickling. 5.TIG welding,smooth and neat. 6.The plastic caps is made of plastic,black.  |
Pays: | China |
N ° de modèle: | ZA-GYC-18 |
Prix FOB: | Obtenir le dernier prix |
Localité: | China |
Prix de commande minimale: | - |
Commande minimale: | 450 Set |
Packaging Detail: | Steel parts in foam bag, wood parts in carton. |
Heure de livraison: | Within 20 work days if one 20FT container. |
Capacité de Fournir: | 30000 Set per Month |
Payment Type: | Other, Western Union, T/T |
Groupe de produits : | - |