Prix FOB
Obtenir le dernier prix( Negotiable )
|1 Piece Minimum Order
Pays:
China
N ° de modèle:
HC001A-560/580
Prix FOB:
( Negotiable )Obtenir le dernier prix
Localité:
China
Prix de commande minimale:
-
Commande minimale:
1 Piece
Packaging Detail:
Carton
Heure de livraison:
20 days after got prepayment
Capacité de Fournir:
1000 Piece per Month
Payment Type:
T/T, L/C
Groupe de produits :
Personne àcontacter Ivy
Wenzhou, Zhejiang
Manhole cover is installed on the top of the tank to prevent the fuel leakage when tank is over rolled, built in P/V vent to adjust the pressure, when there is pressure difference between inside and outside the tank.It will automatically inlet or echaust air when there is accident or under high temperature, it will adjust pressure so that it can ensure the safety and environmental protection. It has second class open design, when open the up binder plate, it will release the pressure out to prevent the worker from the pushing over; in the main plater of the manhole, there are two blingding holese can be installed with optic senor, dip thbe or ternal vacuum valve according to the user's demands; hooped connecting way, which instead of flanged connecting to make the installation more convenient and reliable. It is suitable to transport petroleum, diesel, diesel, kerosene and the other light oil and so on.
Pays: | China |
N ° de modèle: | HC001A-560/580 |
Prix FOB: | ( Negotiable ) Obtenir le dernier prix |
Localité: | China |
Prix de commande minimale: | - |
Commande minimale: | 1 Piece |
Packaging Detail: | Carton |
Heure de livraison: | 20 days after got prepayment |
Capacité de Fournir: | 1000 Piece per Month |
Payment Type: | T/T, L/C |
Groupe de produits : | manhole cover |