Prix FOB
Obtenir le dernier prix29510 ~ 32790 / Unit
|1 Unit Minimum Order
Pays:
China
N ° de modèle:
-
Prix FOB:
29510 ~ 32790 / Unit Obtenir le dernier prix
Localité:
-
Prix de commande minimale:
29510 per Unit
Commande minimale:
1 Unit
Packaging Detail:
-
Heure de livraison:
-
Capacité de Fournir:
-
Payment Type:
L/C, T/T
Groupe de produits :
-
Personne àcontacter Mr. ShengHong
NO.115, Road QingYang Bei, Kunshan, Jiangsu
Machine Loading and Unloading
Process: Automatically loading → Punching → Unloading
Speed: 0.6 sec/punching(Distance: Max: **0mm)
Positioning Accuracy: Â +/*0.**5mm
Workpiece Size: Min: *0mm x *0mm; Max: **0mm x **0mm; in accordance
with mould size.
Mould Size: die block: **0mm x **0mm; mold: **0mm x **0mm.
Dimension: L x W x H: ***0mm x **0mm x ***0mm
Voltage: AC **0V~**0V
Power: 0.5kw/h
Air Pressure: 0.5~0.7MPa
Weight: 0.3T
Accessories of Machine Loading and Unloading
Plastic Toolbox: 1 pcs; large size.
Allen Key: 1 set(for machine maintenance); a must tool for
conventional M3, M4, M5, or M6 screws.
Slotted Screwdriver: Conventional alloy steel; handle diameter:
3mm~5mm.
Phillips Screwdriver: Conventional alloy steel; handle diameter:
3mm~5mm.
Cable Tie   : Nylon *6, *0 pcs.
Nozzle: Homemade(nozzle + hardware fittings + magnet); 5 pcs.
Silicone Nozzle: SP**6, *0 pcs, along with hardware fittings.
PU Plastic Tube(6mm): 2 pcs
PU Plastic Tube(8mm): 2 pcs
Screw M***5: *0 pcs
Screw M***0: *0 pcs
Screw M***5: *0 pcs
Thread Seal Tape: 1 pcs
Quick Connector: Thread PT 1/4(6.*5mm) for 6mm pipe; 5 pcs in
total.
Pays: | China |
N ° de modèle: | - |
Prix FOB: | 29510 ~ 32790 / Unit Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | 29510 per Unit |
Commande minimale: | 1 Unit |
Packaging Detail: | - |
Heure de livraison: | - |
Capacité de Fournir: | - |
Payment Type: | L/C, T/T |
Groupe de produits : | - |