Prix FOB
Obtenir le dernier prix( Negotiable )
|1 Forty-Foot Container Minimum Order
Pays:
China
N ° de modèle:
M Steel Structure House
Prix FOB:
( Negotiable )Obtenir le dernier prix
Localité:
China
Prix de commande minimale:
-
Commande minimale:
1 Forty-Foot Container
Packaging Detail:
packing by pallet and loading in 40HQ
Heure de livraison:
at least 20 days
Capacité de Fournir:
1000 Square Meter per Week
Payment Type:
L/C, T/T
Groupe de produits :
Personne àcontacter Ms. Serena
Putian Road, Suzhou, Jiangsu
Compared with traditional H type steel structure, it saves
*5%Â quantity of steel with lower materials cost,
The steel structures are batch production in factory, so the
production period is short.
With simple structure, it is also easy and quick to assemble
and dismantle by bolts. **5 persons can install about ****0㎡
house per day.
It is more covenient to load and ship,
The structure is more safe and has better wind
resistance.Â
Galvanized steel structure takes the house better anti-corrosion
performance.
EPS or Glass Wool sandwich panel takes better thermal insulation.
Pays: | China |
N ° de modèle: | M Steel Structure House |
Prix FOB: | ( Negotiable ) Obtenir le dernier prix |
Localité: | China |
Prix de commande minimale: | - |
Commande minimale: | 1 Forty-Foot Container |
Packaging Detail: | packing by pallet and loading in 40HQ |
Heure de livraison: | at least 20 days |
Capacité de Fournir: | 1000 Square Meter per Week |
Payment Type: | L/C, T/T |
Groupe de produits : | M Steel Structure House |