Prix FOB
Obtenir le dernier prix1 /
|- Minimum Order
Pays:
China
N ° de modèle:
JL-A-127
Prix FOB:
Localité:
-
Prix de commande minimale:
1
Commande minimale:
-
Packaging Detail:
carton/wooden by international standard
Heure de livraison:
5-7 days for sample preparation, 7-30 days for goo
Capacité de Fournir:
10000 Meter per Day
Payment Type:
L/C, T/T
Groupe de produits :
Personne àcontacter Doris
Shenzhen, Guangdong
LED T5 intergrative aluminum tube shell. Intergrative aluminum & High quality PC Cover. Hight transmittance of PC Cover.
JL-A***7
Specification | T5 Integrative aluminum & 2/3 PC Cover & Endcaps |
Driver | Inside *9**2mm |
PCB Size | W*0 * H1.0mm |
PC Cover | transparent/ stripe/ diffusion |
Endcaps | HC****7 |
How to buy them???
1.Payment in L/C and T/T are
workable;
2.Discounts are allowed according to your order
quantity;
3.Payment terms: T/T , *0% deposits to be paid before
production, *0% balance to be paid before
shipment;
4.
Time of delivery: **5 days for sample preparation, ***0 for goods
production
5. Sample: Free sample is allowed if the length of sample no more than 1 meter. But freight cost on your account.
Factory
Found in ***2, our company is a leader of manufacturing all kinds of plastic extrusion product, specializing in manufacturing LED tube shell. With the latest technology standard, we can meet market demand and strictly carry out the quality management system of ISO***1. We must insist the business philosophy of 'Customer first, Positive innovations'. Believe me, Choose us is your best choice.
Best Production
There are numbers of production lines from all over the world in our company. We are the best supplyer and professional manufacturer to satisfy with your any requirement.
Our Fair
Your Choice, Our Pleasure.
Pays: | China |
N ° de modèle: | JL-A-127 |
Prix FOB: | 1 / Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | 1 |
Commande minimale: | - |
Packaging Detail: | carton/wooden by international standard |
Heure de livraison: | 5-7 days for sample preparation, 7-30 days for goo |
Capacité de Fournir: | 10000 Meter per Day |
Payment Type: | L/C, T/T |
Groupe de produits : | T5 LED tube light housing |