LED Solid Maintenance Free Explosion Proof Light Corrosion Proof Lamp By SHBLE,
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs. Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
LED Solid Maintenance Free Explosion Proof Light Corrosion Proof Lamp LED Solid Maintenance Free Explosion Proof Light Corrosion Proof Lamp LED Solid Maintenance Free Explosion Proof Light Corrosion Proof Lamp LED Solid Maintenance Free Explosion Proof Light Corrosion Proof Lamp
Next

LED Solid Maintenance Free Explosion Proof Light Corrosion Proof Lamp

185 ~ 190 USD / Set ( Negotiable )

|

1 Set Minimum Order

Pays:

China

N ° de modèle:

BLEL1504

Prix FOB:

185 ~ 190 USD / Set ( Negotiable ) Obtenir le dernier prix

Localité:

Shanghai, Chian

Prix de commande minimale:

185 per Set

Commande minimale:

1 Set

Packaging Detail:

foam box and paper carton

Heure de livraison:

7-25 DAYS

Capacité de Fournir:

50000 Set per Month

Payment Type:

PayPal, D/P, D/A, L/C, T/T

Groupe de produits :

-

Contacter maintenant

SHBLE

China

Membre gratuit

Personne à contacter Cheryl

Shanghai, Shanghai

Contacter maintenant

Spécification du produit

  • Protection Grade:IP66
  • Rated Voltage:AC100-240v/50Hz
  • Light source power:100W
  • Corriosn proof grade:WF1*WF2
  • Inlet thread:G3/4"
  • Light Source:LED

La description

BLEL***4 series explosion-proof LED floodlights (hereinafter referred to as

floodlights) can be used in Zone 1 and Zone 2 hazardous areas where II A and IIB explosive gas mixture presents with T4 to T6 classification,and Zone *1 and Zone*2 hazardous areas with combustible dust atmospheres. applied in railways, electric power, steel,oil fields, etc.

 



1. Working conditions

    a.Ambient temperature:**0ºC≤Ta≤**0ºC,**0ºC~**5ºC;

    b.Standard atmospheric pressure: *0kpa(0.8bar)*1 lOkpa (1.1 bar), Normal oxygen content:

*1%v/v;

    c.Relative humidity: ≤*5%;

     d.Used in Zone 1 and Zone 2 hazardous areas where explosive gas mixture presents with T4 to T6 classification and combustible dust area zone *1 and *2;

    e.Vibration and shake free;

    f.Areas without gas or vapor which affects the performance of insulation;

    g.Pollution grade: 3;



2. Compliances

IEC ******0:***1     EN******0:***2

IEC ******1:***7     EN******1:***7

IEC *******1:***8    EN*******1:***9



3. Structure

3.1, Shell using aluminum alloy die-casting molding (ADC*2),with high-pressure electrostatic plastic sprayed surface,with anti-corrosion ability is very strong.

3.2, Using a cylindrical flameproof structure, reliable explosion-proof performance.Tempered glass is made of high strength tempered glass, fully meet the high energy shock resistance and thermal fusion requirements.

3.3,The exposed fasteners are made of stainless steel.

3.4, By introducing the device into the wire wiring cavity; steel pipe; lamps and are provided with a grounding screw shall be reliably grounded users.The shock effect is good, less heat, more safe and reliable.

 

4. Main technical parameters

Talbe1:

























 
Type Rated Power(W)              Ex-mark
**0ºC≤Ta≤**0ºC **0ºC≤Ta≤**5ºC


 
**0  II 2 G Exd IIB T6 Gb

 II2 D Ex tb III CT *0ºC Db IP*6

 
 II 2 G Exd IIB T5 Gb

 II2 D Ex tb III CT*5ºC Db IP*6

 
**0  II 2 G Exd IIB T5 Gb

 II2 D Ex tb III CT *5ºC Db IP*6

 
 II 2 G Exd IIB T4 Gb

 II2 D Ex tb III CT **0ºC Db IP*6

 
 

Talbe2:















 
Working Voltage Cable O.D(φ mm) Inlet Thread
**0V~**0V AC  *0/*0Hz Φ*0~φ*4 2×M*5×1.5
 





5. Usage and Maintenance:

5.1 Check data on nameplate meet actual site conditions;

5.2 Check whether there are damage,distortion or loose on enclosure;

5.3 Workers of maintenance and repair shall be with professional knowledge and operation skills;

5.4 Conductors have been connected well,earthing stably;

5.5 In the repair shall be cut off before the explosion proof lamp power, open the cover off the power within ten minutes to ban open lamp, so as not to be high temperature scald; no off the power immediately after the cover with capacitor.

5.6 Electric gap,creepage distance and flameproof thread shall meet standard requirements during installation and maintenance;

5.7 During the installation, repair, should be properly protected flameproof surface, coated on the replacement of ****1 type rust preventive oil.

5.8  The installation sequence

a)At the time of installation, remove the nut, remove the seal assembly.

b)Selected to meet the requirements of the cable length(Only the cables suitable for *0ºC ).

c)The cable sleeve seals (when the outer diameter of cable is more than Phi *1 in concentric circles, the seal in the round out). A sealing ring, Don't appear small cable wear big hole sealing ring phenomenon, so can not clamp sealing effect of explosion proof performance.

d)The cable and terminal connection, and connect the inner earth.

e)Press the sealing ring, the cable clamping, sealing is reliable.

f)The cap screw, and screw lock.

g)Connect the external.

5.9During the installation, repair, care should be taken to ensure the flameproof sealing pressing body and the shell and explosion-proof cable introducing device in order to avoid the influence of inlet or explosion-proof lamp,explosion-proof performance.

5.*0 Should regularly check the explosion-proof lamp fastener looseness,sealing,corrosion Rubber seals harden or become sticky, wire insulation layer is greenish or carbonation, insulation if there  Is deformation or scorch marks.Such as the discovery of the problem, should Be timely repair replacement. Regularly check the frequency of at least two times a year.Application of wet cloth to wipe the surface in dust environment.

Pays: China
N ° de modèle: BLEL1504
Prix FOB: 185 ~ 190 / Set ( Negotiable ) Obtenir le dernier prix
Localité: Shanghai, Chian
Prix de commande minimale: 185 per Set
Commande minimale: 1 Set
Packaging Detail: foam box and paper carton
Heure de livraison: 7-25 DAYS
Capacité de Fournir: 50000 Set per Month
Payment Type: PayPal, D/P, D/A, L/C, T/T
Groupe de produits : -

Send a direct inquiry to this supplier

To:

Cheryl < SHBLE >

Je veux savoir: