LED Bulb Light By Startac InternationaL Co. Ltd,
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs.
Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
LED Bulb Light
Next

LED Bulb Light

|

- Minimum Order

Pays:

Taiwan

N ° de modèle:

CTF-F60-A5*1W B22/E27/E26

Prix FOB:

Localité:

Taiwan

Prix de commande minimale:

-

Commande minimale:

-

Packaging Detail:

-

Heure de livraison:

30-45 Days

Capacité de Fournir:

-

Payment Type:

Other, PayPal, Money Gram, Western Union, D/P, L/C, T/T

Groupe de produits :

-

Contacter maintenant
Membre gratuit

Personne à contacter Mr. Shyam

Blk 3, 5th Fl.,No.11, Min chuan West road,, Taipei, TW

Contacter maintenant

La description

Specification:

1.S/W:*0***5mm/**8g              
2.T c:W:********0K
C:********0K     
3.Luminous Flux
CW: **0±*0 lm
WW:**0±*0 lm.

Voltage/ Watts

AC*****5V  
AC******0V 6W          
H/Pled:1W*5  

Why choose our products

1: The PMMA optical lens is produced by our company which is independent R & D design, no spot, high transmittance, light uniformity, which is a lot of products on the world cannot be achieved today.

2: Power supply, power supply is a key factor in the product of led, The price of the same specifications of the power is difference very large in the current market. Why does this happen? The reason is the good power need the supply of High-quality components and modern production equipment, and professional technical design, as well as strict aging test, so as to ensure the power quality. The cheap power does not product by the professional production process. But, Our power is through the most stringent requirements; we have only one objective that is for the customer to make the most reliable products.

3: Unique exterior design. Look beautiful, clean, and elegant.
 

Pays: Taiwan
N ° de modèle: CTF-F60-A5*1W B22/E27/E26
Prix FOB: Obtenir le dernier prix
Localité: Taiwan
Prix de commande minimale: -
Commande minimale: -
Packaging Detail: -
Heure de livraison: 30-45 Days
Capacité de Fournir: -
Payment Type: Other, PayPal, Money Gram, Western Union, D/P, L/C, T/T
Groupe de produits : -

Send a direct inquiry to this supplier

To:

Mr. Shyam < Startac InternationaL Co. Ltd >

Je veux savoir: