Prix FOB
Obtenir le dernier prix10000 ~ 2e+07 USD / Set
|1 Set Minimum Order
Pays:
China
N ° de modèle:
xh
Prix FOB:
10000 ~ 2e+07 USD / Set Obtenir le dernier prix
Localité:
-
Prix de commande minimale:
10000 per Set
Commande minimale:
1 Set
Packaging Detail:
as your require
Heure de livraison:
20 days to 35 days
Capacité de Fournir:
10 Set per Month
Payment Type:
T/T
Groupe de produits :
Personne à contacter Ms. Flora
No. 188, Xinhai Street, Fushan high-tech industrial development district, Yantai, Shandong
ã€Process Introduction】
Gold CIP Production
Line adsorbs gold from cyaniding pulp by active
carbon including 7 steps: leaching pulp preparation, cyaniding
leaching, carbon adsorption, gold loaded carbon desorption,
pregnant solution electrodeposit, carbon regeneration, leaching
pulp.It is very useful gold recovery method in mineral
processing.
There are two kinds of ore suitable
for gold CIP production line: flotation gold concentrate,
amalgamation and gravity tailings; mudded oxidized ore
[Process Description]
Before the adsorption of cyaniding pulp, remove the wood chips to avoid it adsorbs the gold and blocks the carbon screen.
Leaching and adsorption of gold CIP production lineAdding carbon in the leaching tank; the carbon absorbs gold becoming gold loaded carbon. After adsorption, carbon screen separates the carbon and pulp.
Desorption electrolysis of gold CIP production line
Under high temperature and
pressure, gold loaded carbon separates gold mud and carbon in
closed system
After simple pickling and impurity removal, the gold ingots are obtained
Desorption electrolysis system with high efficiency, low energy consumption and fastUnder the high temperature and pressure, this system has advantages of no cyanide, automatic controlling, high efficiency, fast and low energy consumption.
High Efficiency: When the grade of gold loaded carbon reaches 3000g/t, desorption rate can reach more than 96%.
Fast: due to the high temperature
and pressure, the time of desorption electrolysis is 12 hours
shortened by 50-70%
Low energy consumption: due to the same temperature and fast working, the energy consumption is 1/2-1/4 of regular system
No cyanide: without adding NaCN in desorption solution, low cost and no pollution
High grade gold mud, extract gold mud easily
Automatic control: installed level liquid control system, temperature control system, automatic control system
Safety: With three security
measures, system intelligent, automatic limit pressure and
pressure release mechanism, safety valve
Pays: | China |
N ° de modèle: | xh |
Prix FOB: | 10000 ~ 2e+07 / Set Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | 10000 per Set |
Commande minimale: | 1 Set |
Packaging Detail: | as your require |
Heure de livraison: | 20 days to 35 days |
Capacité de Fournir: | 10 Set per Month |
Payment Type: | T/T |
Groupe de produits : | mining processing plant |