Prix FOB
Obtenir le dernier prix|
50 Liter Minimum Order
Pays:
China
N ° de modèle:
Q-283
Prix FOB:
Localité:
Guangdong, China (Mainland)
Prix de commande minimale:
-
Commande minimale:
50 Liter
Packaging Detail:
1LX12tins/ctn;
Heure de livraison:
15-20 Days
Capacité de Fournir:
-
Payment Type:
T/T, L/C
Groupe de produits :
Personne àcontacter Tina
Shenzhen, Guangdong
Substrate:
|
Junctions of 2K topcoat /clear
coat between the new and old paint film.
|
Mixing
Ratio:
|
Used directly; if mixed, Thinner
SRA: the rest paint in spray gun in
ratio=1:2.                  Â
|
Spray
Method:
|
Spray interface in arc shape
with Thinner SRA DL***3 at once after repair finished. Dust free *0
seconds later spray second coatings, Each coating should be in
****0micron thickness.
|
Un
applicable:
|
1K Metallic Basecoat and
Primer
|
Shelf Life:
|
2 years in original
seal
|
Packaging:
|
1L X *2tins/Ctn
|
Pays: | China |
N ° de modèle: | Q-283 |
Prix FOB: | Obtenir le dernier prix |
Localité: | Guangdong, China (Mainland) |
Prix de commande minimale: | - |
Commande minimale: | 50 Liter |
Packaging Detail: | 1LX12tins/ctn; |
Heure de livraison: | 15-20 Days |
Capacité de Fournir: | - |
Payment Type: | T/T, L/C |
Groupe de produits : | paints&coating |