Julong Gold Mining Equipment, Gold Selecting machinery By Qingzhou Julong Machinery,
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs. Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Julong Gold Mining Equipment, Gold Selecting machinery
Next

Julong Gold Mining Equipment, Gold Selecting machinery

20000 ~ 200000 USD / Set ( Negotiable )

|

1 Set Minimum Order

Pays:

China

N ° de modèle:

-

Prix FOB:

20000 ~ 200000 USD / Set ( Negotiable ) Obtenir le dernier prix

Localité:

-

Prix de commande minimale:

20000 per Set

Commande minimale:

1 Set

Packaging Detail:

in container or in bulk vessel

Heure de livraison:

20-40 days after receive the prepayment

Capacité de Fournir:

100 Set per Year

Payment Type:

L/C, T/T

Groupe de produits :

Contacter maintenant
Membre gratuit

Personne à contacter Steven

Weifang, Shandong

Contacter maintenant

La description

1.Julong Gold Mining Equipment

Julong gold mining equipment is widely used both on land and in water area(together with dredger ) for
 gold selecting. From mini portable gold dredger to large union, Julong is able to provide a varity of 
designs to fit for different working conditions. With more than *0 years experience, Julong gold mining
 machinery shows competitive feature, like large capacity, high recovery, high accuracy grade, simple 
operation and maintenance, strong structure, ect.


Not only gold but also other metals from river,such as wolfram,stannum,lead,zinc,stibium,diamond,
can be selected by our equipment.




2.Component

JuLong gold mining machinery usually include material feeding system,material sieving system,
gold separating system,
 water supplying system,and power supplying system.

 

Feeding system*-Chain bucket, hopper, Stock bin, Transport belt

Material sieving system*-Roller screen

Gold separating system*-Automatic washing machine,Centrifuge, Motionless sluice chute. Vibration chute

Water supplying system*-Including the pipe and pump from pump to equipment, not from headwaters to pump

Power supplying system*-Motor, generator.

 

3.Julong service

1.Soonest responds. Whenever you sent request to Julong, you will receive responds within *4 hours.

2.Design preview.Our engineer can make the 3D preview to let customer know their product more clearly.

3.Field service. Julong field service can assist on-site with reassembly and commissioning.  Training and technical assistance can also be done locally.

4.Customer financing. Julong will help customer find some way for their financing.

5.Spare part. Julong Parts Services offers low prices, efficient and cost-effective delivery and short response times.Besides,Julong also provide advice on parts purchasing.

Pays: China
N ° de modèle: -
Prix FOB: 20000 ~ 200000 / Set ( Negotiable ) Obtenir le dernier prix
Localité: -
Prix de commande minimale: 20000 per Set
Commande minimale: 1 Set
Packaging Detail: in container or in bulk vessel
Heure de livraison: 20-40 days after receive the prepayment
Capacité de Fournir: 100 Set per Year
Payment Type: L/C, T/T
Groupe de produits : Gold&Iron mining machinery

Send a direct inquiry to this supplier

To:

Steven < Qingzhou Julong Machinery >

Je veux savoir: