Prix FOB
Obtenir le dernier prix18 ~ 25 USD /
|2 Minimum Order
Pays:
China
N ° de modèle:
910/60176
Prix FOB:
18 ~ 25 USD / Obtenir le dernier prix
Localité:
China
Prix de commande minimale:
18
Commande minimale:
2
Packaging Detail:
JCB ORIGINAL PACKING OR NEUTRAL PACKING
Heure de livraison:
5-15 DAY
Capacité de Fournir:
100 Carton per Week
Payment Type:
T/T, Western Union
Groupe de produits :
Personne àcontacter Ms. rainbow
117 road, Shandong
Cable throttle control assembly for jcb 3CX Backhoe loader
**0/****6 **3/F***9
PART NO.
 **0/****6 **3/F***9
APPLICATION:
FOR JCBÂ 3CX
PACKING : JCB ORIGINAL PACKING OR NEUTRAL PACKING
PORT OF LOADING : QINGDAO
DELIVERY DATE: **7 DAYS
 FAQ:
Q 1. Are you trading company or manufacturer?
ÂA: We are trading company.
ÂQ 2. What's the payment term?
ÂA: We accept T/T or L/C at sight.
ÂQ 3. How long is your delivery date?
ÂA: Generally is takes **7 days if we have stock, otherwise it takes about ****5 days depending on the qty.
ÂQ 4. What is your standard packing?
ÂA: All the goods will be packed by carton box and loaded with pallets. Special packing method can be accepted when needed.Â
ÂQ5: How soon I can get the quotation?
ÂA: If your information is complete. We offer our quotation within *4 hours.
ÂQ6: Do you have a minimum order requirement?
ÂA:Small trial order is acceptable.
Pays: | China |
N ° de modèle: | 910/60176 |
Prix FOB: | 18 ~ 25 / Obtenir le dernier prix |
Localité: | China |
Prix de commande minimale: | 18 |
Commande minimale: | 2 |
Packaging Detail: | JCB ORIGINAL PACKING OR NEUTRAL PACKING |
Heure de livraison: | 5-15 DAY |
Capacité de Fournir: | 100 Carton per Week |
Payment Type: | T/T, Western Union |
Groupe de produits : | CABLE THROTTLE |