Prix FOB
Obtenir le dernier prix4.5 ~ 22 /
|2000 Piece Minimum Order
Pays:
China
N ° de modèle:
jf-1
Prix FOB:
4.5 ~ 22 / Obtenir le dernier prix
Localité:
china
Prix de commande minimale:
4.5
Commande minimale:
2000 Piece
Packaging Detail:
steel stip, 50 or 60pcs/bundle
Heure de livraison:
30days
Capacité de Fournir:
6000 Piece per Day
Payment Type:
T/T, L/C
Groupe de produits :
-
Personne àcontacter Mr. fucai
tianjin jinghai, Tianjin, Tianjin
These shores provide vertical support to
roofs and floors. The method is designed to arrange a system of
beams and posts that can both support a building's weight and
transfer the weight to a foundation on the ground. Builders install
dead shores by cutting holes into walls and inserting vertical
beams or girders to prop up the structure above. Dead shores, which
are vertical props, are braced to a sole plate on the ground, and
needles are secured horizontally to the tops of the dead shores.
Builders should leave enough distance between the dead shores and
the walls to allow workers to pass through the
space.
Â
Pays: | China |
N ° de modèle: | jf-1 |
Prix FOB: | 4.5 ~ 22 / Obtenir le dernier prix |
Localité: | china |
Prix de commande minimale: | 4.5 |
Commande minimale: | 2000 Piece |
Packaging Detail: | steel stip, 50 or 60pcs/bundle |
Heure de livraison: | 30days |
Capacité de Fournir: | 6000 Piece per Day |
Payment Type: | T/T, L/C |
Groupe de produits : | - |