Prix FOB
Obtenir le dernier prix|
5 Set Minimum Order
Pays:
China
N ° de modèle:
AM -GSM-9N
Prix FOB:
Localité:
China
Prix de commande minimale:
-
Commande minimale:
5 Set
Packaging Detail:
standard packing
Heure de livraison:
30 ~ 60 days after recived payment
Capacité de Fournir:
30 Set per Month
Payment Type:
Western Union, T/T
Groupe de produits :
-
China
Personne àcontacter Chen
West Tiyu Str., Guangzhou, Guangdong
Mould steel | P*0, H*3, **8H, ***8, SKD*1, NAK*0, ***7, S**6H, etc |
Plastic material | ABS, PC, PE, PP, HDPE, PPR, PVC, PBT, PS, PET, etc |
Mould base | LKM, HASCO, etc |
Mould runner | Cold runner and Hot runner, etc |
Mould Hot runner | DME, HASCO, YUDO, etc |
Mould cold runner | Point way, side way, follow way, direct gate way, etc |
Mould standard parts | DME, HASCO, etc |
Mould life | It mainly depends on various kinds of steel. |
Design software | Solidwork, UG, PRO-E, CAD, etc |
Mould doff way | Doff plate, ejectors, air valves, hydraulic jar, etc |
Mould hot treatment | Including quencher, nitridation, tempering, etc |
Mould cooling system | Water cooling or Beryllium bronze colling, etc |
Process | CNC milling center high speed, EDM machine (Taiwan), wire cut (sodick), etc |
Mould shipment | By sea, By air etc |
Mould packing | Wooden case |
Pays: | China |
N ° de modèle: | AM -GSM-9N |
Prix FOB: | Obtenir le dernier prix |
Localité: | China |
Prix de commande minimale: | - |
Commande minimale: | 5 Set |
Packaging Detail: | standard packing |
Heure de livraison: | 30 ~ 60 days after recived payment |
Capacité de Fournir: | 30 Set per Month |
Payment Type: | Western Union, T/T |
Groupe de produits : | - |