Indonesian steaming coal 6500 By PT. LAWANG NUSANTARA,
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs.
Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Indonesian steaming coal 6500 Indonesian steaming coal 6500 Indonesian steaming coal 6500
Next

Indonesian steaming coal 6500

69 ~ 71.5 / Metric Ton ( Negotiable )

|

50000 Metric Ton Minimum Order

Pays:

Indonesia

N ° de modèle:

-

Prix FOB:

69 ~ 71.5 / Metric Ton ( Negotiable ) Obtenir le dernier prix

Localité:

Indonesia

Prix de commande minimale:

69 per Metric Ton

Commande minimale:

50000 Metric Ton

Packaging Detail:

Barging cargo to mother vessel Cargo

Heure de livraison:

7- 15 days

Capacité de Fournir:

900000 Metric Ton per Year

Payment Type:

L/C

Groupe de produits :

Contacter maintenant
Membre gratuit

Personne à contacter Mr. Zainal

Office 8, level 18-A, Jl. Jend Sudirman, South Jakarta, Jakarta, Jakarta

Contacter maintenant

La description

***0 Coal from North of Kalimantan At a Glance

Commodity: Indonesian single mine steaming coal

Quality:

   
 
 

Basis

 
 
 

Typical

 
 
 

Rejection

 
 
 

Measure

         
 
 
 

Gross Calorific Value

 
 
 

As received

 
 
 

6,**0

 
 
 

*5.0

 
 
 

%

 
 
 

Fixed Carbon

 
 
 

Air dried basis

 
 
 

By difference

   
 
 

%

 
 
 

Hardgrove Index (HGI)

   
 
 

*8

   
 
 
 

Size

 
 
 

0 - *0mm

 
 
 

*0

  %
 
Quantity:  2 x *0,**0 metric tonnes +/- *0% to be shipped (Seller Option)

Option: Na

Delivery:Nunukan anchorage, North Kalimantan, Indonesia

Load rate: Geared & grabber vessel, 8,**0mt SHINC PWWD, excluding major 9 Indonesian holidays by vessel with min 4x*5MT Cranes and 4x*2 CBM grabs. Vessel to be max *5 years

Exploration : Drilling **2 holes (*1,**4m with interval *0m), Logging **1 holes (*0,**3m), Topografi 1,**2Ha with scale 1:***0. IUP Operation Production of 1,**0Ha, Enviromental Permit, Feasibility Study Approval of 1,**0Ha, Agreement with Forestry Company as Land Owner, Forestry Permit (IPP) of **3,8 Ha.

Coal Reserve : Mineable Reserves 4.0 Milllion mt, SR *5

Coal Quality : TM *0%, IM 6%, Ash *0%, FC *4%, VM *3%, TS 3.5%, CV ***0GAR, HGI *8, AFT ***00C Reducing, Low Slagging & Fouling Index (attached typical spec)

Coal Pricing : ...$ FOB Mother Vessel
 

Payment : By a confirmed and irrevocable Letter of Credit issued by a reputable international bank acceptable to seller and received by sellers bank not later than 7 business days prior to barge ETA loading port, negotiable at sight at Sellers bank with usual standard documents. 

Inspection: Loading port analysis and weight final for settlement to be determined by PT. Sucofindo Ltd. 


Port of load: Private Port Type owned by Medco, Crushing Plant **0tph Cap, Barge Loading 1,**0 tph Cap, Draft 4.0 m for **0ft Barge. 

Barging: Barging *0 km (*3 NM) to Nunukan Anch (URL : *-*9*0 N/***-***0 E) with draft *4 m, Loading rate Geared and Grabber Vessel 8,**0 tpd. 

Full Capacity **0,**0 mtpa or *0,**0 mt per month +/- *0% 

Pays: Indonesia
N ° de modèle: -
Prix FOB: 69 ~ 71.5 / Metric Ton ( Negotiable ) Obtenir le dernier prix
Localité: Indonesia
Prix de commande minimale: 69 per Metric Ton
Commande minimale: 50000 Metric Ton
Packaging Detail: Barging cargo to mother vessel Cargo
Heure de livraison: 7- 15 days
Capacité de Fournir: 900000 Metric Ton per Year
Payment Type: L/C
Groupe de produits : Energy fossil fuel product

Mots-clés correspondants PT. LAWANG NUSANTARA

Send a direct inquiry to this supplier

To:

Mr. Zainal < PT. LAWANG NUSANTARA >

Je veux savoir: