Prix FOB
Obtenir le dernier prix|
- Minimum Order
Pays:
China
N ° de modèle:
-
Prix FOB:
Localité:
Baoji
Prix de commande minimale:
-
Commande minimale:
-
Packaging Detail:
-
Heure de livraison:
-
Capacité de Fournir:
1 Set per Month
Payment Type:
-
Groupe de produits :
-
Personne àcontacter Ms. Alice
No 17 shiling road, Baoji, Shaanxi
1. Conventional gas production wellhead 2. tubing construction 3. large diameter safety joint 4. Seventh level ejector 5. Sixth Level ejector 6. Small tubing joint 7. Fifth Level ejector  8. ForthLevel ejector  9.Third level ejector *0. Second level ejector *1. First level ejector *2. Check Valve *3. screen tube *4. Guide shoe
Â
Hydraulic jet
fracturing string introduction
Â
Though hydraulic abrasive perforating after forming channels in
the
reservoir then continue jetting, under the action of high pressure water
jet the pore formed and pressurized while enhancing annulus pressure,
when the bore pressure exceed formation breakdown pressure the layer
breakdown immediately, then realize hydraulic jet fracturing.
The concept of hydraulic jet fracturing:
Â
Â
Pays: | China |
N ° de modèle: | - |
Prix FOB: | Obtenir le dernier prix |
Localité: | Baoji |
Prix de commande minimale: | - |
Commande minimale: | - |
Packaging Detail: | - |
Heure de livraison: | - |
Capacité de Fournir: | 1 Set per Month |
Payment Type: | - |
Groupe de produits : | - |