Prix FOB
Obtenir le dernier prix|
5 Ton Minimum Order
Pays:
China
N ° de modèle:
HD02
Prix FOB:
Localité:
-
Prix de commande minimale:
-
Commande minimale:
5 Ton
Packaging Detail:
wax paper+PP+Plastic fibre
Heure de livraison:
35 DAYS
Capacité de Fournir:
3000 Ton per Month
Payment Type:
L/C, T/T
Groupe de produits :
Personne àcontacter Mr. Steve
Feng Haung Town Zhangjia Gang City, Jiangsu
he production capacity installed corresponds to more than *2.**0
tons per year of skived and roller burnished / honed
tubes.
All the equipment have been designed and built by Stelmi, taking a
great advantage of a *5 years long production
experience.
Stelmi equipment machines the tube horizontally; the tube turns and
the tool translates, carried at one end of the boring bar. Rotation
and translation may be varied continuously. Machining the tube
horizontally means an easier control of the tube itself from both
sides and an easier positioning for long tubes. The machining
operation is fully automated.
PROCESS EVALUATION
Compared with honing, skiving and roller burnishing process
offers not only a better accuracy but also a better surface
quality.
A comparison between standard production samples is shown
hereafter; skived and roller burnished material has a lower Ra and
Rz and a better bearing factor. The picture displays a *0% Tpi
achieved, by honing, at a depth of 1,*9 ?m The same Tpi value can
be found at a depth of only 0,*7 ?m thanks to the skiving and
roller burnishing process. The shown differences are very important
for the gaskets life; for honed tubes, after **0 working hours the
gaskets are already *0% worn out. This is due to the fact that the
gaskets operate like a "tool",Â
working to smooth the small, sharp peaks resulting from the honing
operation. This phenomenon is unknown for skived and roller
burnished tubes.The superior surface quality offered by the skived
and roller burnished tubes is essential when a cylinder operates at
high speed. The skived and roller burnished surface is superior
also for
very slow displacements, avoiding the "stick-slip" phenomena. Honed
surfaces on the opposite require frequent gaskets
maintenanaces.
Â
WT (inch)/ OD (inch) |
0.**9 | 0.**6 | 0.**8 | 0.**9 | 0.**0 | 0.**3 | 0.**5 | 0.**6 | 0.**8 | 0.**0 | 0.**3 | 0.**5 | 0.**0 | 1.**0 |
 0.**0 |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
 0.**3 |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
0.**5 | Â | Â | Â | Â | Â | Â | Â | Â | Â | Â | Â | Â | Â | Â |
 0.**0 |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
0.**5 | Â | Â | Â | Â | Â | Â | Â | Â | Â | Â | Â | Â | Â | Â |
 1.**0 |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
 1.**0 |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
 1.**0 |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
 2.**0 |  |  |  |  |  |  |  |  | &n |
Pays: | China |
N ° de modèle: | HD02 |
Prix FOB: | Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | - |
Commande minimale: | 5 Ton |
Packaging Detail: | wax paper+PP+Plastic fibre |
Heure de livraison: | 35 DAYS |
Capacité de Fournir: | 3000 Ton per Month |
Payment Type: | L/C, T/T |
Groupe de produits : | Steel Tube and Pipe |