Prix FOB
Obtenir le dernier prix( Negotiable )
|1 Minimum Order
Pays:
China
N ° de modèle:
-
Prix FOB:
( Negotiable )Obtenir le dernier prix
Localité:
BEIJING CHINA
Prix de commande minimale:
-
Commande minimale:
1
Packaging Detail:
-
Heure de livraison:
7 MONTHS
Capacité de Fournir:
1 per Month
Payment Type:
T/T, L/C, Other
Groupe de produits :
-
Personne àcontacter Mr. Simon Zhang
Beijing, Beijing
Technical Process:
Feeding Cart → Decoiler → Opener → Pinch Roll → Shear →
Welder→ 1# Tension roller → Entry Looper(CPC) → 2# Tension
roller→ CPC→ Adjusting Roll → Annealing Furnace → Snout →Zinc Pot→
Sink Roller → Air Knife → Cooling Fan → CPC In Tower → Turning
Roller In Cooling Tower → Water Cooling →Squeezing Rooler → CPC →
3# Tension roller→ Tension Leveller → 4# Tension roller→
Passivation → Hot Air Dryer → Exit Looper(CPC)→ 5# Tension
roller→ Shear → Pinch Roll(Guilding Plate) →
Recoiler(EPC) → Unloading Cart→ Saddle
Specification:
Techonology: improved SENDZIMIR method
Productio Capacity: Max **0m/min
Zinc Coacting: *****0G/M2
Surface: spangle, small spangle, non-spangle
Width range:(******0mm;******0mm;*******0mm)********0mm
Â
Pays: | China |
N ° de modèle: | - |
Prix FOB: | ( Negotiable ) Obtenir le dernier prix |
Localité: | BEIJING CHINA |
Prix de commande minimale: | - |
Commande minimale: | 1 |
Packaging Detail: | - |
Heure de livraison: | 7 MONTHS |
Capacité de Fournir: | 1 per Month |
Payment Type: | T/T, L/C, Other |
Groupe de produits : | - |