Prix FOB
Obtenir le dernier prix1700 ~ 1900 USD / Piece ( Negotiable )
|1 Piece Minimum Order
Pays:
China
N ° de modèle:
1268903467
Prix FOB:
1700 ~ 1900 USD / Piece ( Negotiable )Obtenir le dernier prix
Localité:
chongqing qijiang
Prix de commande minimale:
1700 per Piece
Commande minimale:
1 Piece
Packaging Detail:
caton
Heure de livraison:
3-15 days
Capacité de Fournir:
100 Piece per Month
Payment Type:
T/T, L/C, D/A, D/P, Western Union, Money Gram, PayPal
Groupe de produits :
Personne àcontacter Mr. Lie
sanjiang street , qijiang district, chongqing city, Chongqing, Chongqing
QJ**6/S***0 GEARBOX
Available range:
Vehicle Length:****3.7meters
Engine/Chassis Power:******5KW
S***0 GEARBOX DATA |
|||||||
Max Input Power |
******5KW |
||||||
Max Input Torque |
*******0N.m |
||||||
Rated Speed |
***0r/min |
||||||
Total Weight |
**5KG |
||||||
Gears |
1st |
2nd |
3rd |
4th |
5th |
6th |
Reverse |
Direct Gear |
6.*8 |
4.*6 |
2.*4 |
1.*9 |
1.*1 |
1 |
6.*3 |
Overspeed Gear |
7.*3 |
4.*9 |
2.*5 |
1.5 |
1 |
0.*1 |
6.*8 |
Overspeed Gear |
6.*7 |
3.*1 |
2.*2 |
1.*6 |
1 |
0.*4 |
5.*7 |
Odomter Drive Ratio |
Mechanical type 1.**5(available 2 transmission device)/Electronic type 1:8 or1:6 |
||||||
Shift Gear Way |
1st*5th synchronizer shift/Reverse gear shift by Combined sleeve |
||||||
Mounting Type |
Left/Right Horizontal,Vertical,installed with engine directly or separately |
||||||
Stem Fuel Tank Capacity |
Horizontal installation *3L,Vertical *0L |
||||||
Retarder |
Available |
Â
Our Field:
1. 5 speed
gearbox assembly & spare parts: S***0, S***0,
S***0, S***0(QJ**5), S****0(QJ***5)
2. 6 speed
gearbox assembly & spare parts: S***0, S***0,
AK***0, S****0, S****0, S****0(QJ***6), S****0Â
3. 9 speed
gearbox assembly & spare parts: 5S***0GP,
5S***1GP
4. *6 speed
gearbox auto parts: *6S**9, *6S**0, *6S**1, *6S**1,
*6S**0, *6S**1, *6S**1, *6K**0
Pays: | China |
N ° de modèle: | 1268903467 |
Prix FOB: | 1700 ~ 1900 / Piece ( Negotiable ) Obtenir le dernier prix |
Localité: | chongqing qijiang |
Prix de commande minimale: | 1700 per Piece |
Commande minimale: | 1 Piece |
Packaging Detail: | caton |
Heure de livraison: | 3-15 days |
Capacité de Fournir: | 100 Piece per Month |
Payment Type: | T/T, L/C, D/A, D/P, Western Union, Money Gram, PayPal |
Groupe de produits : | transmission assembly |