Prix FOB
Obtenir le dernier prix0.5 ~ 1.5 USD / Meter ( Negotiable )
|1000 Meter Minimum Order
Pays:
China
N ° de modèle:
DN100
Prix FOB:
0.5 ~ 1.5 USD / Meter ( Negotiable )Obtenir le dernier prix
Localité:
-
Prix de commande minimale:
0.5 per Meter
Commande minimale:
1000 Meter
Packaging Detail:
-
Heure de livraison:
7 days after deposit confirmed
Capacité de Fournir:
2000000 Meter per Month
Payment Type:
-
Groupe de produits :
-
Personne àcontacter Ms. huairong
49no, Huaian, Jiangsu
~The main technical parameters:
Overall structure: flexible thread
Impact resistance: the impact test apparatus height ******0mm,
impact 0.**6.8kg.
Resistant to bending: bending test no rupture
Withstanding Voltage: ***0KV.AC.*0HZ, *5mm without breakdown and
arcing phenomena.
Termite: conform GB***1.*5 standard
Pressure test: 5s in the load *0N, continued 1min rate change in
diameter of less than *5%.
Impact test: *0 ℃ treated with 0.5kg hammer to **0mm high
impact without damage.
Insulation resistance: MΩ≥5
Pipe forming performance: pipe length is not less than 1.5m,
bendable within *0 ° ***0 ° range, no obvious visual defects.
Ring stiffness: ≥2 or 4 or 6 or 8
~Carbon tube construction method:
 1, The diameter of the bellows select Carbon: According to
the cable diameter, the allowable voltage, current, and other
conditions of the project selection.
2, Ditch digging project: According to relevant regulations and
customer requirements trenching, its width and depth should be
based on the laying of cables may be. From the single-walled
carbon tube and the distance between the grooves is *0mm, tube
and pipe between the *0mm.
3, Carbon threaded pipe laying: after the carbon tube into the
ditch, where the curvature of the wound or to prevent extrusion,
have to use cement potting. In two jacket pipe connecting the
mouth shall brick and cement sheath tube head is fixed.
4, Carbon thread jacket pipe connection: When two single-walled
carbon tube needs docking, the first joint rotation to the end of
the takeover, then spin down to the end of another takeover,
wound that is used PVC sealing tape can.
5. Backfill: Required to carbon thread jacket pipe laying is
completed, with the original soil trenching to backfilling when
and backfill compaction.
6. Note: The laying process, as a result of project needs, need
two tubes or pipes while laying sand to be placed in the space
between the pipe and tube and tamped, or distal end portion of
the pipe, it is recommended Wei Shuai carbon tube pillow brand
dedicated pipe fittings.
Size Inside dia(mm) Outside
dia(mm) thickness length(m)
Φ*0 *0±2.0 *5±2.0 0.*5±0.*5 **0
Φ*5 *5±2.0 *9±2.0 0.*5±0.2 **0
Φ*2 *2±3.0 *8±2.0 0.*5±0.*5 **0
Φ*0 *0±3.0 *8±2.0 1.*5±0.*5 **0
Φ*0 *0±3.0 *0±2.0 1.*5±0.*5 **0
Φ*5 *5±4.0 *5±2.0 1.*5±0.*5 **0
Φ*0 *0±4.0 *9±3.0 1.*5±0.*5 **0
Φ**0 **0±5.0 **8±3.0 1.7±0.8 **0
Φ**5 **5±5.0 **9±4.0 1.*5±0.*5 *0
Φ**0 **0±7.0 **8±4.0 2.1±0.9 *0
Φ**5 **5±*0.0 **0±4.0 2.*5±0.*5 *0
Φ**0 **0±*0.0 **5±5.0 2.*5±0.*5 *0
Â
Pays: | China |
N ° de modèle: | DN100 |
Prix FOB: | 0.5 ~ 1.5 / Meter ( Negotiable ) Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | 0.5 per Meter |
Commande minimale: | 1000 Meter |
Packaging Detail: | - |
Heure de livraison: | 7 days after deposit confirmed |
Capacité de Fournir: | 2000000 Meter per Month |
Payment Type: | - |
Groupe de produits : | - |