Prix FOB
Obtenir le dernier prix|
- Minimum Order
Pays:
China
N ° de modèle:
PWM-PP-264
Prix FOB:
Localité:
-
Prix de commande minimale:
-
Commande minimale:
-
Packaging Detail:
-
Heure de livraison:
-
Capacité de Fournir:
-
Payment Type:
-
Groupe de produits :
-
Personne àcontacter Ms. Lynn
Siyang Economic Development Zone, Suqian, Jiangsu
CONSTRUCTION CABLE | |||
Item | Code No. | Application | Advantage |
Silane XLPE | LF****5 | Insulation and sheath of building wire and power cord | High-speed extrusion, the production speed of *5 machine can reach **0m/min; the surface is smooth, meet the requirements of standard JB/T****6, the cable meets the standard JB/T****1; Oi≥*3; Pass the single vertical combustion test and meet bundle combustion B for 2.5mm² |
LF****5 | |||
LF****0 | |||
LF****5A | Insulation and sheath of building wire and power cord | High-speed extrusion, the production speed of *5 machine can reach**0m/min, the surface is smooth; meet the requirements of standard/T****6, the cable meets the standard JB/T****1; Oi>*5, pass the single vertical combustion test and meet bundle combustion AB for 1.5mm² | |
LF****5A | |||
LF****5 | Insulation of building wire and power cord | Meet the requirements on insulation of standard JB/T****6, JG/T**1 | |
LF****5 | |||
LF****0 |
Since ***9, Mr. Yang Xuehong, the founder of Shuangxin new materials and his core team have been engaged in the new material industry.
1.Q:Are you a factory or trading company?
A: Located in Changzhou, China, the manufacturing
base has more than *0 workers.
Pays: | China |
N ° de modèle: | PWM-PP-264 |
Prix FOB: | Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | - |
Commande minimale: | - |
Packaging Detail: | - |
Heure de livraison: | - |
Capacité de Fournir: | - |
Payment Type: | - |
Groupe de produits : | - |