hair implantation instrument for FUE By Guangzhou baitang medical instrument co., lt,
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs.
Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
hair implantation instrument for FUE hair implantation instrument for FUE hair implantation instrument for FUE hair implantation instrument for FUE
Next

hair implantation instrument for FUE

1466 ~ 1500 / Set ( Negotiable )

|

1 Set Minimum Order

Pays:

China

N ° de modèle:

BT-hair implantation

Prix FOB:

1466 ~ 1500 / Set ( Negotiable ) Obtenir le dernier prix

Localité:

china

Prix de commande minimale:

1466 per Set

Commande minimale:

1 Set

Packaging Detail:

aluminum case + carton box

Heure de livraison:

7

Capacité de Fournir:

-

Payment Type:

T/T, Western Union, PayPal, Other

Groupe de produits :

-

Contacter maintenant
Membre gratuit

Personne à contacter dan

room 617,he xin commercial heguangroad tangxiashangshe,tianhe district,GZ, Guangzhou, Guangdong

Contacter maintenant

La description

hair transplantation instrument, include main machine,drill,knife,tweezer,silicon block,handle,repair tool. we also make instruction DVD to teach you how to use.
allowable rotation speed:(RPM)  ******0
dia of the drill: 0.8mm/1.0mm/1.2mm/1.5mm

user's manual of micromotor handpiece:
how to operate:
1.connect the motor cord and foot pedal cord to the control unit.
2.after confirm the permission power of the control unit,plug the power cord into an electric outlet.
3.set the speed control knob to the slowest position.
4.turn on the power of the control unit.
5.if operate the speed control knob clockwise, the rotation speed of the micromotor increases.
6.when wish to turn a rotating direction,after halt the micromotor,operate the forward/reverse selector switch.
7.when wish to regulate a rotating speed using the foot pedal,after operate the hand/foot selector switch as "FOOT" use.

mounting and removing a bur
1.after turn the set ring of the handpiece clockwise to open the collet chuck,extract a old bur.
2.after insert perfectly a new bur until reach in the back of the collet chuck,turn the set ring counter-clockwise to lock the collet chuck.

checking items in case of not working:
1.confirm whether the power of an electric outlet is suitable in the permission power of the control unit.
2.confirm whether the built-in fuse is blown.
3.confirm whether the power cord,the motor cord and the foot pedal cord are connected correctly.
4.check that the collet chuck of the handpieces is opened.
5.confirm whether carbon brushes of the micromotor are worn away since replace need.
6.in case electron equilibrator operated by overload,press the reset switch or restrart running the control unit after turning off the power.

replacing carbon brushes:
1.after turn off the power of the control unit,remove the carbon housing cover and the motor cord form the rear of the handpiece.
2.remove worn-out carbon brushes after taking off the carbon brush bolts using a screwdriver(+).
3.replace by new ones with observing the brush spring should get jammed in the carbon brush holder.
4.assemble the handpiece.
5.after run the handpiece under no load state about ****0 RPM for *0mins,then use.
replacing cycle of carbon brushes being about one year, can be depending on working hours and loading conditions.


replacing the collet chuck:
1.the hand cap and the spindle set are disjointed by continuously turning the hand cap counterclockwise using the chuck wrench.
2.the collect chuck is disjointed by continuously turning it counterclockwise using tools.
3.after replace by new collet chuck,assemble the handpiece.
4.after run the handpiece under no load state and confirm sth wrong nonexistence,then use.
replacing cycle of the collect chuck being **3 years,can be depending on working hours and loading conditions.


replacing ball bearings:
1.disjoint the hand cap and the spindle set.
2.if remove the C Ring form the front of the chuck housing, ball bearings and other parts are disassembled,
3.after assemble other parts and replace with new ball bearings sequentially,install the C Ring again.
4.joint the hand cap and spindle set.
5.after run the handpiece under no load state and confirm sth wrong nonexistence,then use.



 

Pays: China
N ° de modèle: BT-hair implantation
Prix FOB: 1466 ~ 1500 / Set ( Negotiable ) Obtenir le dernier prix
Localité: china
Prix de commande minimale: 1466 per Set
Commande minimale: 1 Set
Packaging Detail: aluminum case + carton box
Heure de livraison: 7
Capacité de Fournir: -
Payment Type: T/T, Western Union, PayPal, Other
Groupe de produits : -

Send a direct inquiry to this supplier

To:

dan < Guangzhou baitang medical instrument co., lt >

Je veux savoir: