Prix FOB
Obtenir le dernier prix100000 USD / Set
|1 Set Minimum Order
Pays:
China
N ° de modèle:
XB03
Prix FOB:
100000 USD / Set Obtenir le dernier prix
Localité:
China
Prix de commande minimale:
100000 per Set
Commande minimale:
1 Set
Packaging Detail:
in bulks or in container
Heure de livraison:
60 days
Capacité de Fournir:
20 Set per Year
Payment Type:
L/C, T/T
Groupe de produits :
Personne àcontacter Ms. Lisa
Chunguang Road, Mihe Town, Weifang, Shandong
ÂÂ
Gold mining dredger is a kind of joint factory which collects mining and mineral separation; it is also placer gold
 mining equipment, which includes mining system, mineral and water supply systems, waste dealing system,ÂÂ
tailings system, deck machinery; the hull, the upper steel structure, electricity system, and several other basicÂÂ
systems. From the beneficiation process, the gold panning ship is divided into fixed chute, belt chute, circular jigger;
 and from the mining capabilities, the ship is divided into *5 L, *5 L, *0 L, *0 L, **0 L, **0 L , **0 L, **0 L, **0 L,
 and so on.
ÂÂ
Pays: | China |
N ° de modèle: | XB03 |
Prix FOB: | 100000 / Set Obtenir le dernier prix |
Localité: | China |
Prix de commande minimale: | 100000 per Set |
Commande minimale: | 1 Set |
Packaging Detail: | in bulks or in container |
Heure de livraison: | 60 days |
Capacité de Fournir: | 20 Set per Year |
Payment Type: | L/C, T/T |
Groupe de produits : | sand digging vessel |