Glass Production Line (Turnkey Project) By Suzhou CMT Engineering Company Limited,
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs. Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Glass Production Line (Turnkey Project)
Next

Glass Production Line (Turnkey Project)

|

1 Acre Minimum Order

Pays:

China

N ° de modèle:

-

Prix FOB:

Localité:

-

Prix de commande minimale:

-

Commande minimale:

1 Acre

Packaging Detail:

-

Heure de livraison:

-

Capacité de Fournir:

-

Payment Type:

-

Contacter maintenant
Membre gratuit

Personne à contacter Mr. Chen

No.12 Huanghe Road, Changshu, Jiangsu

Contacter maintenant

Spécification du produit

  • Glass Type : Glass

La description

I. Main technical parameter:
1. Melt ability on the 1st: 40t/d
Fold into glass thickness is 5 mm, Daily output is 2600 m2
2. Product varieties: Colourless transparent glass; 
3. Product specifications: Thickness range 2- 10mm;
4. The width of original board of glass: 2400mm; 
5. Product quality: Accord with the national standard in the People's Republic of China; 
6. Comprehensive yield: 80%
7. Unit utilization ratios: 97.5%

8. Melts the life-span of the kiln: 4

1. Raw materials (The qualified powder material enters the factory)
1.1 Conditions of quality of different raw materials
image

Note: The accurate requirement of different raw materials should be decided after the quality of the raw material is confirmed. 

2. Fuel: Natural gas:

3. Supply power:
3.1 Demands consist of two pieces of independent power, so as to ensure that supplies power incessantly. 
3.2 That enters factory's voltage:10KV±5%, frequency 50Hz± 1%, supplies power steadily in succession. 
3.3 Supply power in workshop: 
Voltage 380V/220V±10%, frequency 50Hz. 
3.4 The installed capacity of  factories of equipment invites :100KVA; 
Calculate load in normal production: < 60kwh. 


4. Pictures
image

image

 
SN. Project
1 Raw materials workshop
2 Production unites the workshop
2.1 Melt the section
2.2 Shaping section
2.3 Section that anneal
2.4 Cut and judge the section of the finished product
2.5 Bits of broken glass system
3 Affiliated facility
3.1 Compress the air and stand
3.2 Circulating water system
3.3 Laboratory
4 Support the distribution system
5 System ofNatural gas
6 Installation and cold adjustment (cold adjustment is about 120days)

Pays: China
N ° de modèle: -
Prix FOB: Obtenir le dernier prix
Localité: -
Prix de commande minimale: -
Commande minimale: 1 Acre
Packaging Detail: -
Heure de livraison: -
Capacité de Fournir: -
Payment Type: -
Groupe de produits : Turnkey Project For Building Materials

Send a direct inquiry to this supplier

To:

Mr. Chen < Suzhou CMT Engineering Company Limited >

Je veux savoir: