Prix FOB
Obtenir le dernier prix40000 ~ 70000 / Set ( Negotiable )
|1 Set Minimum Order
Pays:
China
N ° de modèle:
-
Prix FOB:
40000 ~ 70000 / Set ( Negotiable )Obtenir le dernier prix
Localité:
-
Prix de commande minimale:
40000 per Set
Commande minimale:
1 Set
Packaging Detail:
40'FR+40'HQ
Heure de livraison:
15 days after receving advance payment
Capacité de Fournir:
30 Set per Month
Payment Type:
T/T, L/C
Groupe de produits :
-
Personne à contacter pyrolysis
Zhengzhou, Henan
1. With an auto welding machine for the reactor, it can not only
greatly improve working efficiency but also guarantee the quality
of welding seam, thus avoid explosion caused by gas leak.
2. Professional heating treatment and x-ray detection chamber are
especially for welding.
3. Vacuum system will prevent oil gas from going back to reactor
and causing accident.
4. Professional thermometer, pressure gauge and safety valve.
5. It is dangerous to burn exhaust gas(C1 to C4) without any safety
measures. In our process, it is transferred first through the
safety device and a safety burning air muzzle. Before burning, we
should ensure the safety of production.
Environmental friendly
1.Well water de-dusting system can avoid black smoke.
2.The exhaust gas will be recycled for heating reactor, no gas
pollution
3.Every junction of the reactor is in good sealing situation with
professional sealing material.
Energy saving
1. Well sealing for heating system , no gas leak and saving
fuel.
2. The exhaust gas will be recycled for reactor heating.
Profit analysis
(Here we take *0ton waste tires as example)
From Tire To Furnace Oil Process
Cost:
Raw material cost: USD / TON×*0Ton= USD
Fuel material cost: USD / KG× KG= USD
(Here you could have four different choices: ***0 kilocalorie
Coal****0kg, Fuel oil********0kg, Natural gas********0cubic,
Wood********0kg)
Powder consumption: Average *0KW/h USD/KW×*0hours= USD
Worker's salary: USD/Day×4Persons= USD
Profit:
Oil Profit: USD/Ton×4.5Ton= USD
Carbon black: USD/Ton×3Ton= USD
Steel wire: USD/Ton×1.5Ton= USD
Gross Profit:
Total profit USD ï¼ Total cost USD= USD
From Furnace Oil To Fuel Oil Process
(If *0ton waste tires then 5ton capacity is enough for this
link)
Cost:
Raw material cost: USD / TON×5Ton= USD
Fuel material cost: USD / KG× KG= USD
(Here you could have four different choices: ***0 kilocalorie
Coal****0kg, Fuel oil********0kg, Natural gas********0cubic,
Wood********0kg)
Powder consumption: Average *0KW/h USD/KW×*0hours= USD
Worker's salary: USD/Day×4Persons= USD
Profit:
Oil Profit: USD/Ton×4.5Ton= USD
Gross Profit:
Total profit USD ï¼ Total cost USD= US
Pays: | China |
N ° de modèle: | - |
Prix FOB: | 40000 ~ 70000 / Set ( Negotiable ) Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | 40000 per Set |
Commande minimale: | 1 Set |
Packaging Detail: | 40'FR+40'HQ |
Heure de livraison: | 15 days after receving advance payment |
Capacité de Fournir: | 30 Set per Month |
Payment Type: | T/T, L/C |
Groupe de produits : | - |