Galvanized scaffolding steel plank / walk board /platform By Changsha Xiangjia Metal Material Co., ltd.,
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs. Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Galvanized scaffolding steel plank / walk board /platform Galvanized scaffolding steel plank / walk board /platform Galvanized scaffolding steel plank / walk board /platform Galvanized scaffolding steel plank / walk board /platform
Next

Galvanized scaffolding steel plank / walk board /platform

|

1000 Piece Minimum Order

Pays:

China

N ° de modèle:

-

Prix FOB:

Localité:

-

Prix de commande minimale:

-

Commande minimale:

1000 Piece

Packaging Detail:

AS CUSTOMER REQUIRED

Heure de livraison:

20-30 DAYS AFTER RECEIVING THE DEPOSIT OR L/C

Capacité de Fournir:

10000 Piece per Month

Payment Type:

Western Union, L/C, T/T

Groupe de produits :

Contacter maintenant
Membre gratuit

Personne à contacter Doria

No.46, East Renmin Rd., Yuhua Dist., Changsha, Hunan

Contacter maintenant

Spécification du produit

La description

Galvanized scaffolding steel plank/walk board/platform 

 

 

 

 

 

1) A larger capacity

 

When the scaffolding geometry and structure is compliant with the relevant requirements, the general single-tube column scaffold bears capacity of up to *5kN ~ *5kN (1.5tf ~ 3.5tf, design value).

 

 

 

2) Easy disassembly, erection and flexible

 

Easy to adjust the length of the tube, fastener connection is simple, and thus can adapt to all kinds of plane, elevation of buildings and structures with the scaffold.

 

 

 

3) To compare the economy

 

Processing is simple, a relatively low investment costs; if well-designed scaffolding geometry, focus on improving working capital utilization rate of steel, the material consumption can be achieved better economic results. Fastening steel frame construction steel per square meter equivalent to about *5 kg.

 

 

 

 

 

Details







































 
 

Size (mm)

 

Weight (kg/pc)

 

Size (mm)

 

Weight (kg/pc)

 

WALK BOARDS

 

CATWALK

 

**0 x *5 x 1.2 x ***0

 

*3.*0

 

**0 x *0 x 1.2 x ***9

 

*5.*0

 

**0 x *5 x 1.2 x ***0

 

*0.*6

 

**0 x *5 x 1.2 x ***9

 

*3.*0

 

**0 x *5 x 1.2 x ***0

 

6.*3

 

**0 x *5 x 1.2 x ***9

 

*3.*0

 

**0 x *5 x 1.2 x ***0

 

3.*9

 

**0 x *8 x 1.2 x ***9

 

 

Pays: China
N ° de modèle: -
Prix FOB: Obtenir le dernier prix
Localité: -
Prix de commande minimale: -
Commande minimale: 1000 Piece
Packaging Detail: AS CUSTOMER REQUIRED
Heure de livraison: 20-30 DAYS AFTER RECEIVING THE DEPOSIT OR L/C
Capacité de Fournir: 10000 Piece per Month
Payment Type: Western Union, L/C, T/T
Groupe de produits : Steel plank

Send a direct inquiry to this supplier

To:

Doria < Changsha Xiangjia Metal Material Co., ltd. >

Je veux savoir: