Prix FOB
Obtenir le dernier prix4500 ~ 4800 USD / Ton
|50 Kilogram Minimum Order
Pays:
China
N ° de modèle:
HLN40-1
Prix FOB:
4500 ~ 4800 USD / Ton Obtenir le dernier prix
Localité:
-
Prix de commande minimale:
4500 per Ton
Commande minimale:
50 Kilogram
Packaging Detail:
-
Heure de livraison:
One week after firm po
Capacité de Fournir:
-
Payment Type:
L/C, T/T
Groupe de produits :
-
Personne àcontacter michelle
yongjia dadao, Huangshan, Anhui
Production Name  Full Crosslink Powdered Nitrile Butadiene Rubber(PNBR) Â
Product IndexÂ
 Appearance: White or little yellow powder
 Mooney Viscosity,ML**01*4:**0 ~ **0           Â
Acylonitrile Content,%  :  *6 ~ *0
 Sift Rate(0.*5mm),%  : ≥*8
 Valatile,%  :   ≤1
Basic CharacterÂ
HLN ***1 is high temperature polymerized, full crosslinked arylontrile butadiene rubber which has high mooney viscosity and high ACN content. It uses special technology of agglomeration into powder which owns natural isolation agent. It shows good resistance to oil, heat, cold and solvent. It also has good toughness.
Property Superiority
HLN***1 owns excellent adhensive ability. It can enhance the adhensive performance for friction material, improve the molding’s toghness and make the finish products very flexible . HLN***1 is a wonderful friction material modifer.
ApplicationÂ
HLN ***1 is mainly used in friction materials of car, train, motorcycle and so on.
Application Guidence    Â
According to different usage and performance demand, the dosage of HLN***1 is viriable. When HLN***1 mix with phenolic resin, it can use dry way to mix. We advice the HLN***1 content is 4~*0%.
Safe guidence    Â
Except for good industrial operation diretions, there is no special safe measure demanded. Please prevent dust formation and keep away from fire.
Package        net weight is *0 kg/cartonÂ
Â
Pays: | China |
N ° de modèle: | HLN40-1 |
Prix FOB: | 4500 ~ 4800 / Ton Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | 4500 per Ton |
Commande minimale: | 50 Kilogram |
Packaging Detail: | - |
Heure de livraison: | One week after firm po |
Capacité de Fournir: | - |
Payment Type: | L/C, T/T |
Groupe de produits : | - |