Prix FOB
Obtenir le dernier prix650 ~ 780 / Ton
|10 Ton Minimum Order
Pays:
China
N ° de modèle:
RMR-TK-8
Prix FOB:
650 ~ 780 / Ton Obtenir le dernier prix
Localité:
-
Prix de commande minimale:
650 per Ton
Commande minimale:
10 Ton
Packaging Detail:
packing in bundle with steel strips; with seaworthy package at the end; could be done with your requ
Heure de livraison:
usually within 10-30 days after receipt of deposit
Capacité de Fournir:
10000 Ton per Month
Payment Type:
T/T, L/C, Western Union
Groupe de produits :
Personne àcontacter Ms. Eugene
Hi-tech Information Square, Building C, #909, Tianjin, Tianjin
We Offer You: Â
 FROM CHINA MANUFACTURER MILD STEEL PIPES PRE GALVANIZED
Â
Details & pictures of pre galvanized steel pipe
 FROM CHINA MANUFACTURER MILD STEEL PIPES PRE GALVANIZED |
||
1. Material |
Steel Grade |
Q**5, Q**5, Q**5 etc. |
Material Type |
Available in cold rolled and hot rolled |
|
2. Size |
W.T |
0.8mm*2.5mm |
Diameter |
*0mm~**9mm |
|
Length |
5.8m**2m, other lengths could also be produced |
|
3. Zinc Coating |
*0~*0g/m2, could be thicker or thinner if you need. |
|
4. Certification |
BV, IAF, SGS,COC, ISO etc. |
|
5. Welding Technology |
Longitudinal ERW |
|
6. Application |
Building materials, machine structure, agriculture equipment, water and gas pipes etc. |
|
7. Packing |
Packing in bundle with steel strips; with seaworthy package at the end; could be done with your requirement. |
|
8. Delivery Time |
Usually within ****0 days after receipt of deposit, ASAP |
|
9. Trade Terms |
FOB, CFR, CIF etc. |
|
*0. Payment Terms |
T/T, L/C etc. |
|
*1. Loading Port |
Xingang , Tianjin |
|
*2. Original Place |
Tianjin, China |
|
*3. Company Information |
Name |
Reliance Metal Resource Co., Ltd |
Type |
Manufacture and trading company |
|
Supply Ability |
**0,**0 tons per year |
|
Key words: steel pipes galvanized, mild steel pipes, steel pipe manufacturer . |
Pays: | China |
N ° de modèle: | RMR-TK-8 |
Prix FOB: | 650 ~ 780 / Ton Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | 650 per Ton |
Commande minimale: | 10 Ton |
Packaging Detail: | packing in bundle with steel strips; with seaworthy package at the end; could be done with your requ |
Heure de livraison: | usually within 10-30 days after receipt of deposit |
Capacité de Fournir: | 10000 Ton per Month |
Payment Type: | T/T, L/C, Western Union |
Groupe de produits : | Pre-galvanized pipe |