Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs.
Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
FORMWORK CLAMP RAPID SPRING CLAMP FORMWORK CLIP FORMWORK CLAMP RAPID SPRING CLAMP FORMWORK CLIP FORMWORK CLAMP RAPID SPRING CLAMP FORMWORK CLIP FORMWORK CLAMP RAPID SPRING CLAMP FORMWORK CLIP
Next

FORMWORK CLAMP RAPID SPRING CLAMP FORMWORK CLIP

0.35 ~ 0.4 / Piece ( Negotiable )

|

10000 Piece Minimum Order

Pays:

Turkey

N ° de modèle:

FM

Prix FOB:

0.35 ~ 0.4 / Piece ( Negotiable ) Obtenir le dernier prix

Localité:

Istanbul,Turkey

Prix de commande minimale:

0.35 per Piece

Commande minimale:

10000 Piece

Packaging Detail:

In sacks in quantity of 50 pieces

Heure de livraison:

Within 1-1, 5 weeks

Capacité de Fournir:

250000 Piece per Month

Payment Type:

D/P, D/A, L/C, T/T

Groupe de produits :

Contacter maintenant

AS METAL

Turkey

Membre gratuit

Personne à contacter Mr. Furkan

Silahtaraga Street,No:225/A, Istanbul, Eyup

Contacter maintenant

Spécification du produit

  • BRAND NAME:AS METAL
  • MATERIAL:ST-37 STEEL
  • SURFACE TREATMENT:GALVANIZED OR PAINTED
  • USAGE:ON CONSTRUCTION REBARS
  • AVAILABLE BASE THICKNESSES:3-3,5-4 MM
  • PACKING:IN SACKS IN QUANTITY OF 50

La description

  PRODUCT BASE DIMENSIONS BRIDGE LATCH PACKING PIECE PIECE/GR
1 FORMWORK CLAMP*1 3***0**0 MM-ST *7 2,5 MM-ST *7 5 MM-ST *2 SACK *0 **2 GR
2 FORMWORK CLAMP*2 3***0**0 MM-ST *7 2,5 MM-ST *7 5 MM-ST *2 SACK *0 **4 GR
3 FORMWORK CLAMP*3 3,5***0**0 MM-ST *7  2,5 MM-ST *7 5 MM-ST *2 SACK *0 **8 GR
4 FORMWORK CLAMP*4 3,5***0**0 MM -ST *7 2,5 MM-ST *7 5 MM-ST *2 SACK *0 **0 GR
5 FORMWORK CLAMP*5 4***5**5 MM-ST *7 2,5 MM-ST *7 6 MM-ST *2 SACK *0 **6 GR
 
Formwork clamps,which we call'çiroz kilidi' or 'kalıp kilidi' in turkish,is used to keep the formwoks of columns at same distance
               
during the process of pouring concrete.            
               
it is prevented formworks from opening by connecting it to ribbed irons passed through formworks.      
               
because toothed part holding iron was got rigid,it is prevented from being abraded within short time.    
               
constructive spring clamps are produced as 'galvanized' and 'coloured' at your disposal.        
               
THE BENEFIT OF CONSTRUCTÄ°VE SPRÄ°NG CLAMPS            
               
It defies lateral forces during a earthquake.            
               
It provides concrete cover remaining fixed.

 
           






































































































































 
Formwork clamps,which we call'çiroz kilidi' or 'kalıp kilidi' in turkish,is used to keep the formwoks of columns at same distance
               
during the process of pouring concrete.            
               
it is prevented formworks from opening by connecting it to ribbed irons passed through formworks.      
               
because toothed part holding iron was got rigid,it is prevented from being abraded within short time.    
               
constructive spring clamps are produced as 'galvanized' and 'coloured' at your disposal.        
               
THE BENEFIT OF CONSTRUCTÄ°VE SPRÄ°NG CLAMPS            
               
It defies lateral forces during a earthquake.            
               
It provides concrete cover remaining fixed.            

Pays: Turkey
N ° de modèle: FM
Prix FOB: 0.35 ~ 0.4 / Piece ( Negotiable ) Obtenir le dernier prix
Localité: Istanbul,Turkey
Prix de commande minimale: 0.35 per Piece
Commande minimale: 10000 Piece
Packaging Detail: In sacks in quantity of 50 pieces
Heure de livraison: Within 1-1, 5 weeks
Capacité de Fournir: 250000 Piece per Month
Payment Type: D/P, D/A, L/C, T/T
Groupe de produits : FORMWORK PARTS

Send a direct inquiry to this supplier

To:

Mr. Furkan < AS METAL >

Je veux savoir: