Prix FOB
Obtenir le dernier prix70 ~ 100 / Piece
|1 Piece Minimum Order
Pays:
China
N ° de modèle:
FX04
Prix FOB:
70 ~ 100 / Piece Obtenir le dernier prix
Localité:
China
Prix de commande minimale:
70 per Piece
Commande minimale:
1 Piece
Packaging Detail:
Standard export carton
Heure de livraison:
7days
Capacité de Fournir:
1000 Ton per Week
Payment Type:
PayPal, D/P, L/C, T/T
Groupe de produits :
-
Personne àcontacter daisy
Hefei, Anhui
Item |
Unit | Parameter | |
Product name | Fire truck roller shutter, fire fighting truck roll up door | ||
Water tank volume | L | ***0 | |
Overall dimensions | mm | ***0×***0×***0 | |
Gross weight | kg | ***5 | |
Curb weight | ***5,***0 | ||
Payload capacity | ***0,***5 | ||
Axle load | ***0/***5 | ||
Wheelbase | mm | ***0 | |
Front/Rear track base | ***6/***6 | ||
Front/Rear overhang | ***2/***8 | ||
Approach/Departure angle | ° | *7/*3 | |
Exhaust/Power | ml/hp | ***6/*5 | |
Max speed | km/h | *0 | |
Emission standard | Euro III | ||
Engine model | CY****-C3F | Electric system | *4V |
Traction system | 4×2 | Number of axles | 2 |
Tire specifications | 7.****6 | Number of tires | 6 |
Operation control  system | Electrically hydraulic control | Allowable passengers in cab | 2*3,3*3 |
Equipments and Performance |
1. Water pump: CB*0/*0. 2. Fire cannon: PS*0 3. PTO (Power Take Off) 4. **7 curtain doors equipment boxes 5. ***0mm long row lights |
||
Production cycle | ***0 days | ||
warranty | *2 month, from the date of supply |
Pays: | China |
N ° de modèle: | FX04 |
Prix FOB: | 70 ~ 100 / Piece Obtenir le dernier prix |
Localité: | China |
Prix de commande minimale: | 70 per Piece |
Commande minimale: | 1 Piece |
Packaging Detail: | Standard export carton |
Heure de livraison: | 7days |
Capacité de Fournir: | 1000 Ton per Week |
Payment Type: | PayPal, D/P, L/C, T/T |
Groupe de produits : | - |