Prix FOB
Obtenir le dernier prix1 ~ 15 USD / Piece ( Negotiable )
|1 Ton Minimum Order
Pays:
China
N ° de modèle:
SC-002
Prix FOB:
1 ~ 15 USD / Piece ( Negotiable )Obtenir le dernier prix
Localité:
-
Prix de commande minimale:
1 per Piece
Commande minimale:
1 Ton
Packaging Detail:
1) Bundle, 2) In Bulk 3) Bags 4) Clients Requirements
Heure de livraison:
Within 30 days ofter receiving your prepayment
Capacité de Fournir:
-
Payment Type:
Other, PayPal, Money Gram, Western Union, D/P, D/A, L/C, T/T
Groupe de produits :
Personne àcontacter Caroline
Tianjin, Tianjin
Tianjin Yuanheng Sanctuary Steel Trading Co.,
Ltd
Quick Detail:
Place of Origin: Tianjin,China
Brand Name: Yuanheng SanctuaryÂ
Certification: ISO***1:***8ï¼›BV
Minimum Order Quantity: 1 Ton
Delivery time: Within *0 days after receiving your prepayment
Packaging Details:
1)Â Bundle,
2) In Bulk
3)Â Bags
4) Clients Requirements
Payment Terms: L/C,T/T,or as customers requirements.
Supply Ability:***0 Tons/Month
Caroline
Sun
sunjinzhu***4(at)**6 dot
com
Skype:carolinesun**3Â
Â
Name: | Q**5/Q**5 Ringlock Scaffold |
Category: | Scaffolding System |
Material: | Steel (Q**5/ Q**5/ Q**5/ Q**5B/ Q**5/ Q**5B) |
Vertical size: | D*8*3.*5mm  L0.5m, 1m, 1.5m, 2m, 2.5m, 3m |
Ledger size | D*8*2.5mm  L0.3m, 0.6m, 0.9m, 1.2m, 1.5m, 1.8m, 2.1m, 2.4m |
Surface: | Electric Galvanized, Hot Dipped Galvanized, Painted, Powder Coated |
Color: | White zinc, orange, dark red, blue or as required |
Component |
Standard, Ledger, Diagonal Brace, Side Bracket, Base Jack, U Head Jack, Caster, steel stair, steel plank. |
Application: |
The viaduct bridge and tunnel engineering, such as workshop , elevated water tower, power plants, refineries and other supporting design, also applies to flyover, span the scaffolding. Chimney, water, large-scale concert stage and large projects. |
Manufacturer: | OEM is Available |
Customization by your drawings or standards is available |
Pays: | China |
N ° de modèle: | SC-002 |
Prix FOB: | 1 ~ 15 / Piece ( Negotiable ) Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | 1 per Piece |
Commande minimale: | 1 Ton |
Packaging Detail: | 1) Bundle, 2) In Bulk 3) Bags 4) Clients Requirements |
Heure de livraison: | Within 30 days ofter receiving your prepayment |
Capacité de Fournir: | - |
Payment Type: | Other, PayPal, Money Gram, Western Union, D/P, D/A, L/C, T/T |
Groupe de produits : | scaffolding |