Prix FOB
Obtenir le dernier prix0.1 ~ 0.06 USD / Piece ( Negotiable )
|1000 Piece Minimum Order
Pays:
China
N ° de modèle:
A8/A10/A15
Prix FOB:
0.1 ~ 0.06 USD / Piece ( Negotiable )Obtenir le dernier prix
Localité:
Guangzhou,China
Prix de commande minimale:
0.1 per Piece
Commande minimale:
1000 Piece
Packaging Detail:
Packing strong cartons or plastic bags
Heure de livraison:
7 days after received the desposit
Capacité de Fournir:
10000000 Piece per Week
Payment Type:
PayPal, Money Gram, Western Union, D/P, D/A, T/T
Groupe de produits :
-
Personne àcontacter Sally
Guangzhou, Guangdong
Factory *3mm Aluminum rudder injection packer PU Grouting Injection Packer A8 A*0 Injection packers
Â
Â
model |
Â
Diameter*Length |
Â
A*8 |
Â
*3.5mm X *0mm |
Â
A**0 |
Â
*3.5mm X**0mm |
Â
A**5 |
Â
*3.5mm X**0mm |
Â
B*8 |
Â
*0mm X*0mm |
Â
B**0 |
Â
*0mm X**0mm |
Â
B**5 |
Â
*0mm X**0mm |
 Injection packer is a
must in chemical grout used for injection of epoxy and
polyurethane foam into holes penetrated at a pressure higher than
*0kg/cm(max. Pressure **0kg/cm) on to concrete
structure.
Â
 The injection packer
is a tool for sealing works. It is tightly fixed in the drill
hole of the building component and connects the injection device
with the building. Under pressure the sealing material is
injected into the damaged building component. Packers are made of
different materials such as steel or plastic and various types of
packers are available. The head is provided with a one-way valve,
can prevent the slurry at high pressure into the pour spout. It
is widely used with high pressure grouting
machine.
Construction joint leaking
1 Drill the
hole at the left or right 5CM**0CM at the lowest point of the
construction joint to one-half of the thickness of the
structure, and drill from the low to the high in the order. The
hole distance is *0CM**0CM, and it is better to drill to the
highest point and then bury it again. Water
needle.
2 After the
setting of the grouting water stop needle is completed, the
chemical grouting material is injected into the high pressure
perfusion machine until the grouting liquid is found to ooze
out on the surface of the structure body. 3 After the filling
is completed, the grouting and water stopping needle can be
removed.
Honeycomb leaking
1 At the
hive range, drill a hole every *5CM**0CM, the depth is one-half
of the thickness of the structure, and then fill the grouting
needle and tighten it.
2 After the
water stop needle is set, the chemical grouting material is
injected into the high pressure filling machine until the
grouting liquid is found to ooze out on the surface of the
structure, so that the water leakage problem can be solved. 3
After *8 hours of filling, the grouting needle can be
removed.
Precautions for grouting machines
1 The
connection between the machine includes: high pressure pipe and
switch group, the connection between the high pressure pipe and
the machine needs to be wrapped with raw tape.
2 The screw
parts of the machine also need to be tightened to prevent the
machine from falling apart or missing parts during
high-pressure operation, including machine glue and
handles.
3 The motor
and the machine need to be placed in place without leaving a
gap. Next, let's talk about a few important issues in the
process of use.
4 Since the
material injected by the machine cannot be in contact with
water, the machine is strictly prohibited from washing with
water.
5 machine maintenance is the key to cleaning (after washing
with thinner, it is best to use vegetable oil or oil again,
usually sold in hardware stores)
6 The last and most important problem is the safety of life.
The machine belongs to high-pressure machinery. When the
pressure is too high, it is necessary to stop the injection at
the right time to prevent harm to yourself.
DeliveryÂ
*0 DAY GUARANTEE
Mortarsprayer.com
offers a full refund less shipping if you are not satisfied
with the performance of the tool. The sprayer must be returned
within *0 days of receiving it.
WARRANTYÂ
Full
one-year warranty on parts and workmanship. Jets are considered
consumable parts and are warranted for *0 days (although they
should last the life of the tool if you keep them clean). If
you have problems with your tool and need to return it for
service.
SHIPPINGÂ
When you
place an order, please choose a shipping method and pay for the
order including the shipping fee. We will send the items within
7 days once your payment is completed.Â
Â
Our
products include many kinds of waterproof materials like PU
injection grouting pump, waterproof membrane and other building
machines like cement spraying machine, ect. They all meet the
standard with ISO and are widely used in a lot of building
projects in many other main cities of China. Besides, we keep
friendly cooperation with companies from all over the world,
especially Southeast Aisa.
Â
Pays: | China |
N ° de modèle: | A8/A10/A15 |
Prix FOB: | 0.1 ~ 0.06 / Piece ( Negotiable ) Obtenir le dernier prix |
Localité: | Guangzhou,China |
Prix de commande minimale: | 0.1 per Piece |
Commande minimale: | 1000 Piece |
Packaging Detail: | Packing strong cartons or plastic bags |
Heure de livraison: | 7 days after received the desposit |
Capacité de Fournir: | 10000000 Piece per Week |
Payment Type: | PayPal, Money Gram, Western Union, D/P, D/A, T/T |
Groupe de produits : | - |