Exhaust Gas Heat Recover Boilers For Glass Kilns By Qingdao Kaineng Environmental Protection Technology Co., Ltd,
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs.
Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Exhaust Gas Heat Recover Boilers For Glass Kilns
Next

Exhaust Gas Heat Recover Boilers For Glass Kilns

|

1 Set Minimum Order

Pays:

China

N ° de modèle:

-

Prix FOB:

Localité:

China

Prix de commande minimale:

-

Commande minimale:

1 Set

Packaging Detail:

Standard Export Package

Heure de livraison:

30~150 Days, According to the order items and quan

Capacité de Fournir:

500 Set per Year

Payment Type:

T/T, L/C

Groupe de produits :

-

Contacter maintenant
Membre gratuit

Personne à contacter Wang Qi

Qingdao, Shandong

Contacter maintenant

Spécification du produit

La description

Exhaust Gas Heat Recover Boilers For Glass Kilns
The exhaust gas heat recovery boiler adopts forced circulation, that is, steam and water working fluid are driven by external force (feed water pump, hot water circulation pump) in the pipe. This can make the heating surface layout very compact and without any restrictions.

Heating surface of exhaust gas boiler consists of 2 parts economizer and evaporator. According to the calculation of heat balance of waste heat boiler, the single waste heat boiler should reach 6.0t/h steam output, and the waste heat boiler must set economizer section, and the feedwater absorbs the low and medium energy of exhaust gas. On the one hand, it can increase the feed water temperature and the steam output of the waste heat boiler; on the other hand, it can improve the effective utilization rate of the heating surface in the evaporator section.

In order to improve the heat transfer temperature and pressure of the economizer, the economizer section adopts a countercurrent arrangement, that is, the working medium and the exhaust gas flow direction are opposite, and the evaporator section is still arranged in a downstream flow.

In summary, a waste heat boiler is installed in the flue duct of the kiln tail to achieve the purpose of recovering waste heat of flue gas and protecting the environment. It is of great practical significance to effectively reduce energy consumption and promote the sustainable development of renewable energy.

The location of Kiln Waste Heat Boiler
Under normal conditions, the waste heat boiler of kiln furnace locates in front of the flap valve in the main underground flue, and draws the hot flue gas from underground. After heat transfer and cooling in the waste heat recovery system, the temperature of flue gas is reduced from **0℃***0℃ to about **0℃***0℃. The flue gas is discharged into the reserved hole on the original chimney through the induced draft fan of the waste heat boiler outlet, and then discharge into the atmosphere through the chimney.

Benefits of Kiln Waste Heat Boiler 
1.Highly reliable in operation and robust in construction.
2.Quick Payback Returns are achieved.
3.One time investment with lifetime returns.
4.No combustion, No emission hence Eco-friendly.
5.Energy being put to use, which was getting wasted anyway.

Kiln Waste Heat Boiler Capacity 
Exhaust gas boiler (EGB) are offered in tailor-made capacities as per

About Us
Kaineng Technology is a manufacturer engaged in the design and supply of exhaust gas boilers that help to recover heat from the flue gases of  glass kilns /furnaces to produce steam, hot water to meet demand of user. We have obtained ISO***1, ISO****1 and ISO****1  management system certification, and also gained the works approval by many worldwide classification societies: ABS, BV, CCS, DNV.GL and LR. 

We are committed to providing you with the highest quality products, if you are interested in our products, then contact us!
 

Pays: China
N ° de modèle: -
Prix FOB: Obtenir le dernier prix
Localité: China
Prix de commande minimale: -
Commande minimale: 1 Set
Packaging Detail: Standard Export Package
Heure de livraison: 30~150 Days, According to the order items and quan
Capacité de Fournir: 500 Set per Year
Payment Type: T/T, L/C
Groupe de produits : -

Send a direct inquiry to this supplier

To:

Wang Qi < Qingdao Kaineng Environmental Protection Technology Co., Ltd >

Je veux savoir: