Prix FOB
Obtenir le dernier prix( Negotiable )
|1 Unit Minimum Order
Pays:
China
N ° de modèle:
EF-70P2
Prix FOB:
( Negotiable )Obtenir le dernier prix
Localité:
Shanghai
Prix de commande minimale:
-
Commande minimale:
1 Unit
Packaging Detail:
wooden case
Heure de livraison:
7 days
Capacité de Fournir:
500 Unit per Year
Payment Type:
T/T
Groupe de produits :
Personne àcontacter Mr. Nicholas
604 Room 270# Caoxi Road, shanghai
Use and maintenance:
According to the standard before heating furnace to go, general *0
cm from the advisable, do not make oil surface too high, in order
to avoid overheating in use process zhongyou boiling oil will
overflow or splash cuts.
Replace the oil off the power must be.
Don't wash with water control panel and the electrical box, lest
damage lines produce risk.
Come on, must be in when the oil temperature below *0 ℃ may.
Avoid water drops ?
Pays: | China |
N ° de modèle: | EF-70P2 |
Prix FOB: | ( Negotiable ) Obtenir le dernier prix |
Localité: | Shanghai |
Prix de commande minimale: | - |
Commande minimale: | 1 Unit |
Packaging Detail: | wooden case |
Heure de livraison: | 7 days |
Capacité de Fournir: | 500 Unit per Year |
Payment Type: | T/T |
Groupe de produits : | Electric fryer |