Prix FOB
Obtenir le dernier prix|
1 Minimum Order
Pays:
China
N ° de modèle:
-
Prix FOB:
Localité:
-
Prix de commande minimale:
-
Commande minimale:
1
Packaging Detail:
-
Heure de livraison:
90days after the contract takes effect
Capacité de Fournir:
-
Payment Type:
T/T, L/C
Groupe de produits :
-
Personne àcontacter Betty
Hehuan, Wuxi, Jiangsu
AC-30tons three-phase
EAF
1.late-model short-net
technology to reduce the degree of unbalance for three-phase
impedance;
2.copper-steel conductive
cross arm technology
3.tubular water-cooled wall
and tubular water-cooled furnace roof technology to extense the
service life for the furnace wall
4.eccentric bottom tapping to
achieve tapping without slag
5.equipped with furnace door
non-consumable carbon-oxygen gunÂ
6.the hydraulic system adopts
constant pressure variable pump,the system pressure is
14MPa
7.furnace tilting ,furnace
cover open and electrode lift-down all use rated valve
control
8.controlled by computer and
PLC
The nain raw material
requirements:
1.scrap:in accordance with
the revelant standard of GB/T4233-1996
2.All the refractory material
include alumina brick,magnesia carbon brick,light-weight insulating
brick and etc.All the physicochemical quality must confirm to
governent standard.
Â
Â
main equipment:
1.furnace cover and lifting
rotating device
2.electrode and electrode
lifting device
3.special transformer for
electric furnaceÂ
4.short net
5.water-cooled
system
6.hydraulic system
7.air-compressed
system
8.billet pull-out
car
9.charging pocket
10.water-cooled carbon-oxygen
gun
11.high-low voltage power
supply system
Â
the notes to the machinery
parts:
1.furnace assembling :the
whole furnace body can leave the furnace tilting platform alone to
achieve quick exchange for the furnace body.
2.EBT tapping:
the tapping duration is
90seconds which is 75% less than spout tapping.The tapping temp. is
reduced by 30℃.And the power consumption has reduced by
6-8%.Meanwhile,the molten steel has less intaken the
gas.
Pays: | China |
N ° de modèle: | - |
Prix FOB: | Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | - |
Commande minimale: | 1 |
Packaging Detail: | - |
Heure de livraison: | 90days after the contract takes effect |
Capacité de Fournir: | - |
Payment Type: | T/T, L/C |
Groupe de produits : | - |