Prix FOB
Obtenir le dernier prix( Negotiable )
|200 Piece Minimum Order
Pays:
China
N ° de modèle:
007
Prix FOB:
( Negotiable )Obtenir le dernier prix
Localité:
CN
Prix de commande minimale:
-
Commande minimale:
200 Piece
Packaging Detail:
wooden case+shringking film
Heure de livraison:
60 days for OEM, 15 days for ready goods
Capacité de Fournir:
3000 Piece per Week
Payment Type:
L/C, T/T
Groupe de produits :
-
Personne à contacter Aliciamao
Wuhan, Hubei
Easily Assembled Construction Building Aluminum
Formwork
Aluminum formwork panel also called aluminum alloy
formwork panel.It is made of the overall extrusion forming of
aluminum alloy.Aluminum formwork system is suitable for the high
degree of standardization tall buildings or multi-layer buildings
and villas.
The aluminum frame plastic formwork system is based on the
new development of the current formwork system, which is mainly
suitable for the construction of high-rise building concrete
pouring formwork. It is composed of module system, support system,
fastening system (waler) and accessory system.
Non standard formwork, c-slot, K-plate, floor keel, beam
bottom support formwork are all aluminum alloy formwork. The
support adopts independent steel support and inclined support. The
formwork connection method is pin pin connection, which can be
fully integrated with the existing aluminum alloy formwork.
Aluminum frame plastic formwork, like aluminum alloy formwork, has
two types of screw system and pull sheet system, but the pull sheet
system is better.
Advantages:
Internationally advanced casting equipments
Total area of manufacturing workshop is **0,**0 square meters
Internationally advanced and full automatic product line for
formwork deep processing
Annual aluminum formwork capacity will reach to 2,**0,**0
square meters
Recycling: The life cycle is about
**0 times.
Widely Used:Free size, suitable for any height by connecting different size vertical props together
Easy To Handle: Easy operation, workers under correct direction will be competent for the work.
Emma Mao
Mobile/****6 **8 ***4 ***6 ;
Office address :No.*1 Yinbo Road, Jinghe srteet, Dongxihu, Wuhan,
Hubei,China;
1# Easily Assembled Construction Building Aluminum Formwork
2# Easily Assembled Construction Building Aluminum Formwork
3# Easily Assembled Construction Building Aluminum Formwork
4# Easily Assembled Construction Building Aluminum Formwork
5# Easily Assembled Construction Building Aluminum Formwork
6# Easily Assembled Construction Building Aluminum Formwork
7# Easily Assembled Construction Building Aluminum Formwork
8# Easily Assembled Construction Building Aluminum Formwork
Pays: | China |
N ° de modèle: | 007 |
Prix FOB: | ( Negotiable ) Obtenir le dernier prix |
Localité: | CN |
Prix de commande minimale: | - |
Commande minimale: | 200 Piece |
Packaging Detail: | wooden case+shringking film |
Heure de livraison: | 60 days for OEM, 15 days for ready goods |
Capacité de Fournir: | 3000 Piece per Week |
Payment Type: | L/C, T/T |
Groupe de produits : | - |