Prix FOB
Obtenir le dernier prix2 ~ 10 USD / ( Negotiable )
|500 Piece Minimum Order
Pays:
China
N ° de modèle:
ST-LF
Prix FOB:
2 ~ 10 USD / ( Negotiable )Obtenir le dernier prix
Localité:
-
Prix de commande minimale:
2
Commande minimale:
500 Piece
Packaging Detail:
wooden pallets
Heure de livraison:
15-20days
Capacité de Fournir:
10000 Piece per Week
Payment Type:
Money Gram, Western Union, L/C, T/T
Groupe de produits :
-
Personne àcontacter Lee
Shijiazhuang, Hebei
EAC Cooling Tower Fill Introduction
ÂEAC cooling Tower Fill is one of the most important components for exchange of gas and water in cooling tower. It is the major parts to improve the efficiency of cooling tower and make sure the economy and safe operation.  With the development of the plastic industry, counter-current tower drench water plastic packing "S" shape ladder wave, obliquely wave, which has the heat dissipation ,good performance ,Ventilated small resistance, durable, based on the easy and other advantages, it is widely used in different types of large, medium, small, cooling tower.
ÂÂ
ÂEAC Cooling Tower Fill  Specification
Â
Name |
Â
EAC Cooling Tower Fill |
Â
Type |
Â
Cross flow cooling tower fill |
Â
Material |
Â
PVC, PP, UPVC |
Â
Size |
Â
***0mm*any length |
Â
Thickness |
Â
0.35mm-0.*5mm |
Â
Application Temperature |
Â
*5℃~**5℃ |
Â
Color |
Â
Black |
Â
Packaging Detail |
Â
In bundle, film+wooden pallet or as your requests. |
Â
MOQ |
Â
**0Â pieces |
Â
Delivery period |
Â
Within *5 days after receiving the deposit |
Welcome to contact us: admin at sintafrp.cn; skype:sinta***4
Pays: | China |
N ° de modèle: | ST-LF |
Prix FOB: | 2 ~ 10 / ( Negotiable ) Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | 2 |
Commande minimale: | 500 Piece |
Packaging Detail: | wooden pallets |
Heure de livraison: | 15-20days |
Capacité de Fournir: | 10000 Piece per Week |
Payment Type: | Money Gram, Western Union, L/C, T/T |
Groupe de produits : | - |