Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs. Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
DZJ series Vibration Gravel Pile Driver
Next

DZJ series Vibration Gravel Pile Driver

( Negotiable )

|

1 Set Minimum Order

Pays:

China

N ° de modèle:

DZJ-90

Prix FOB:

( Negotiable ) Obtenir le dernier prix

Localité:

-

Prix de commande minimale:

-

Commande minimale:

1 Set

Packaging Detail:

as required

Heure de livraison:

15days

Capacité de Fournir:

-

Payment Type:

L/C, T/T

Groupe de produits :

Contacter maintenant
Membre gratuit

Personne à contacter Ms. Vivien

Haihe Road, Pizhou Economic Development Zone, Jiangsu Province, China, Xuzhou, Jiangsu

Contacter maintenant

La description

DZJ series Vibration Gravel Pile Driver is the popular machine used for the foundation construction of high-rise building. The hydraulic rotation of this kind of vibration Pipe Gravel Pile is flexible and could rotate **0°.The machinery could be self-installed and self-discharging and it is easy to move because of the Hydraulic Foot-Step system. When transporting, the upper frame will be folded back and the rotary drive do not need to dismantle. With the characters of convenient maintaining and operating, stable and reliable performance, highly economical and efficient,it is the best investment to improve your business productivity.
Operation Process:
1, Move the pile machine and body frame , make the pile tip align with pile location.
2, Drive the Vibratory Hammer, drop the pile to the established depth.
3, Fill in the required volume gravel to the pile machine.
4, Pumping air into the pile machine by air compressor.
5, Lifting the machine1—2m, the gravel will drop to the drilling hole by the air pressure and gravity.
6, Drop the pile machine to ensure the gravel compact.
7, Repeat above (4)、(5)、(6) process.
8,When the gravel in the pile machine to be used at the allowed volume, fill in the gravel again, then repeat above (4)、(5)、(6) process.
9, When the pile machine lifted to the designed height of the pile top, all the process complete.
By this means, the construction speed is 1.**2.6 times than routine methods.
 
Main Technical Data of DZJ**0:
Model
DZJ**0
Description
Vibration Gravel Pile Driver
Max. Piling Length
*8m
Max. Piling Depth
*0m
Max. Piling Diameter
**0mm
Max Vibratory Hammer Model
DZ**0A
Main Winch
Line Pull
8T 
Auxiliary Winch
Line Pull
5T
Line Speed
*2m/min
Line Speed
*7m/min
TravelingMotion
Hydraulic Foot-Step
Overall Dimension
working condition
*4.3×4.7×*7.6m
Overall Weight
*8T
transportation condition
*5.3×2.5×3.2m

Pays: China
N ° de modèle: DZJ-90
Prix FOB: ( Negotiable ) Obtenir le dernier prix
Localité: -
Prix de commande minimale: -
Commande minimale: 1 Set
Packaging Detail: as required
Heure de livraison: 15days
Capacité de Fournir: -
Payment Type: L/C, T/T
Groupe de produits : Pile drivers

Send a direct inquiry to this supplier

To:

Ms. Vivien < Xuzhou Hercules Machine Manufacture Co ., Ltd >

Je veux savoir: