ductile iron pipe By Jincheng Xingfang Pipe Co, .LTD,
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs. Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
ductile iron pipe
Next

ductile iron pipe

|

- Minimum Order

Pays:

China

N ° de modèle:

DN80mm-1200mm

Prix FOB:

Localité:

Shanxi,China

Prix de commande minimale:

-

Commande minimale:

-

Packaging Detail:

Standard Mill's Packing

Heure de livraison:

Within 30 days after signing the contract

Capacité de Fournir:

-

Payment Type:

L/C, T/T

Groupe de produits :

-

Contacter maintenant
Membre gratuit

Personne à contacter Kelly

Jincheng city, shangxi province, nanning, Guangxi

Contacter maintenant

Spécification du produit

  • cast iron:ductile iron

La description

ductile iron pipes

We are professional in produces centrifugal casting ductile iron pipes according to ISO***1 and EN**5 in China. There are 3 centrifugal casting machines and four finish lines for DN******0mm, which can produce **0 thousand tons per year covering *7 sizes.

Material:Ductile iron

(1) The standed:ISO********9,EN*******0,Class:K9

(2) Effective length:6M by  buly shipment,5.7M by *0' or *0' container

(3)  Internal coating: cement mortar lining comply with ISO***9.
     E. External coating: sprayed metallic Zinc coating (min.**0g/㎡) according to ISO***9 + bitumen painting (min.*0micron).

(4) Zinc casting:at least **0g/m2  as per ISO***9

(5) DN**-DN***0mm

(6) T-type

(7) High strength ,lighter than gray iron,good corrosion resistance,no furring,small flow resistance,easy fixing,long life time

(8)  Checked by automatic inspection equipment

Pays: China
N ° de modèle: DN80mm-1200mm
Prix FOB: Obtenir le dernier prix
Localité: Shanxi,China
Prix de commande minimale: -
Commande minimale: -
Packaging Detail: Standard Mill's Packing
Heure de livraison: Within 30 days after signing the contract
Capacité de Fournir: -
Payment Type: L/C, T/T
Groupe de produits : -

Send a direct inquiry to this supplier

To:

Kelly < Jincheng Xingfang Pipe Co, .LTD >

Je veux savoir: