Prix FOB
Obtenir le dernier prix( Negotiable )
|1 Minimum Order
Pays:
China
N ° de modèle:
-
Prix FOB:
( Negotiable )Obtenir le dernier prix
Localité:
-
Prix de commande minimale:
-
Commande minimale:
1
Packaging Detail:
-
Heure de livraison:
-
Capacité de Fournir:
10 Box per Month
Payment Type:
-
Groupe de produits :
-
Personne à contacter Zllychee
Shenzhen, Guangdong
It is specially
used *4AH free
maintenance lead acid battery product testing and ultrasonic the
battery cover. 由于该机自动完æˆæ”¾ç”µæµ‹è¯•ã€å†…阻测试ã€è¶…å£°æ³¢ç„ŠæŽ¥ç›–ç‰‡ï¼Œå› è€Œå¤§å¹…åº¦æ高了生产效率和åˆæ ¼çŽ‡ï¼Œå®žé™…å‡å°‘人工
3 äººï¼Œæ˜¯ç”µæ± åŽ‚å®¶ç»æµŽå®žç”¨ä¹‹è®¾å¤‡ã€‚
As the machine discharge testing,
resistance testing, ultrasonic welding cover automatically, which
greatly improves production efficiency and quality rate, the actual
reduce 3 workers, it is economical and practical battery
manufacturers of equipment.
主è¦åŠŸèƒ½ï¼š
Main features:
1.
High-current discharge test, to see
the value of its voltage drop, to determine the battery capacity
and the internal battery has shutoff, sham weld.
检测åˆæ ¼è‡ªåŠ¨æµå…¥ä¸‹é“å·¥åºæµ‹è¯•ï¼Œæ£€ 测ä¸åˆæ ¼è‡ªåŠ¨æŽ¨å‡ºæ£€æµ‹è¾“é€å¸¦ã€‚
The qualified automatically to next
working procedure test, the prosecution failed test launch
automatically detect conveyor belt.
2. Resistance
test, resistance test to check the battery health status and state
of charge and the connection resistance parameters.
检测åˆæ ¼è‡ªåŠ¨æµå…¥ä¸‹é“å·¥åºæµ‹è¯•ï¼Œæ£€æµ‹ä¸åˆ æ ¼è‡ªåŠ¨æŽ¨å‡ºæ£€æµ‹è¾“é€å¸¦ã€‚The
qualified automatically to next working procedure test, the
prosecution failed test launch automatically detect conveyor
belt.
3. Fitness test,
Put high voltage between the battery plates and shells to see there
is no leakage and ignition, to judge whether seal and leakage
between the shell and the object. 检测åˆæ ¼è‡ªåŠ¨æµå…¥ä¸‹é“å·¥åºç„ŠæŽ¥ï¼Œæ£€æµ‹ä¸åˆæ ¼è‡ªåŠ¨æŽ¨å‡ºæ£€æµ‹è¾“é€å¸¦ã€‚
The qualified automatically into the
next process welding, automatic detection of failed test launch of
conveyor belt.
4. On the tested
batteries, using ultrasonic welding the battery cover, then send
out a full battery.
5. The other, the
aircraft assembly line with the customer before and after docking
with the device, make it easy together with the user factory
assembly line.
Model | DRUM****4 | High-current discharge test | Resistance test | Fitness test | Ultrasonic weld | ||||
Input Power | AC **0V *0Hz | Open/close Voltage | ***9.*9V | Test Voltage | ***9.*9V | Output high voltage | ***0KV | Ultrasonic output power | ***0W |
constringent air | **8kg | Discharge Current | ****0.0A | Test Range | 0.****0.0mΩ | Leak Current | ***0mA | Ultrasonic Frequency | *5KHz |
Test Speed | **0unit/hour | Discharge Time | **9S | Test Frequency | ***0Hz | Test time | **9S | Ultrasonic Route | *5mm |
Belt Width | **0mm | Discharge Voltage | 6.***2.0V | Test Time | **0mS | / | / | Weld Area | W**0XL**0 |
Pays: | China |
N ° de modèle: | - |
Prix FOB: | ( Negotiable ) Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | - |
Commande minimale: | 1 |
Packaging Detail: | - |
Heure de livraison: | - |
Capacité de Fournir: | 10 Box per Month |
Payment Type: | - |
Groupe de produits : | - |