Prix FOB
Obtenir le dernier prix|
3 Ton Minimum Order
Pays:
China
N ° de modèle:
-
Prix FOB:
Localité:
China
Prix de commande minimale:
-
Commande minimale:
3 Ton
Packaging Detail:
Raw Packing or Customer's Requirement
Heure de livraison:
7~15 days
Capacité de Fournir:
2000 Ton per Month
Payment Type:
T/T, L/C
Groupe de produits :
-
Personne àcontacter Jason
2nd Floor,Sihai Commercial building,JingHai Road, Dongguan, Guangdong
Chemical compositions(%) |  |  |  |  |  | ||
Grade | C | Si | Mn | Cr | Ni | P | S |
1.***6 | 0.*6~0.*5 | ≤ 1.*0 | ≤ 0.8 | 1.2~1.4 | ≤ 0.8 | ≤ 0.**5 | ≤ 0.*3 |
2. Compared grades(based on usage): |  |  |  |  |  | ||
Chinese | American | German | Japanese |  |  |  |  |
GB | AISI | DIN | JIS |  |  |  |  |
3Cr*7NiMnMo | **0 | 1.***6 | S**6 |
Heat treatment quench: ********0° C, oil cooling or quenching
liquid colling, hardnessHRC≥ *5
Backfire: Temperture(° C): **0 **0 **0 **0 **0 **0
Hardness(HRC): *9 *7 *6 *6 *7 *2
 Applications:
Used for making the corrosion resistance and wear resistance of
high quaity plastic mould, transport plastic mould, like PVC and
CD mould
Competitive Advantage:
1. Pure & Precision mirror polishing
2. Highly quality of corrosion resistance
3. Convenient heat treatment for quenched&tempered steel,
with out deformed
4. Easy for welding
5. Competitive price
6. Fast production leadtime
7. All the material are inspected with 3 times to meet the highly
standards
8. Stable quality to be guarantee
DongGuan RuiYuan Steel
Co.,Ltd Specializes in plastic mould steel, hot work mould
steel, cold work mould steel alloy steel and carbon
structural steel, such as :P*0, P*0+Ni, 1.***4, 1.***3,
1.***6, H*3, O1, D2, D3, D5, ***5, ***0, A3, ****0(EN*1), ***7,
***0, ***0, ***0, ***0, ***0 and
SCM**0 for exporting
over *0 countries now, such as: Brazil, India, Turkey, Italy,
Germany, Korea, Malaysia, Iran and so onÂÂ
ÂÂ
Pays: | China |
N ° de modèle: | - |
Prix FOB: | Obtenir le dernier prix |
Localité: | China |
Prix de commande minimale: | - |
Commande minimale: | 3 Ton |
Packaging Detail: | Raw Packing or Customer's Requirement |
Heure de livraison: | 7~15 days |
Capacité de Fournir: | 2000 Ton per Month |
Payment Type: | T/T, L/C |
Groupe de produits : | - |