Prix FOB
Obtenir le dernier prix1500 ~ 25000 USD / Set ( Negotiable )
|1 Set Minimum Order
Pays:
China
N ° de modèle:
SJ series
Prix FOB:
1500 ~ 25000 USD / Set ( Negotiable )Obtenir le dernier prix
Localité:
China
Prix de commande minimale:
1500 per Set
Commande minimale:
1 Set
Packaging Detail:
Pallet or case on request
Heure de livraison:
15-35 days
Capacité de Fournir:
1000 Set per Year
Payment Type:
T/T, L/C
Groupe de produits :
Personne àcontacter Ms. Lisa
No.8.Fenghuangshan Road, Zhengjiang, Jiangsu
About Us
Zhenjiang Yijiang Chemical
Co., Ltd was
founded in ***5,specialized in imports and exports business.
Zhenjiang Shen-Ward
Machinery Co., Ltd was
founded in ***7, specialized in the engineering machinery
parts manufacturing, these
years, we
achieved the real integration of industry and
trade.
Since establishment, our company has been
focus on the manufacturing of theundercarriage parts. Based on the manufacturing and
design experience of the undercarriage, the company has developed
the rubber track undercarriage and steel track undercarriage, which
are widely used in various construction machinery, drilling, fire
fighting robot,
underwater dredging equipmentand other
special working machinery.
Product Description for track
undercarriage
1.Complete undercarriage with steel track or rubber track , final drive , hudraulic motors,rollers,crossbeam.
2.Drawings are welcome for track undercarriage.
3.Loading capacity can be from 0.5T to **0T by track undercarriage.
4.We can supply both rubber track undercarriage and steel track undercarriage.
5. Our undercarriage parts application on drilling rigs, excavators, crushers, cranes, aerial platform, etc. with high efficiency and adaption of vile working conditio Excavator undercarriage.
6.The undercarriage can also be designed and manufactured on customers' request.
 Technich parameters of our track undercarriageType |  | Track Varieties | Bearing(Kg) | ||||
A(length) | B(center distance) | C(total width) | D(width of track) | E (height) | |||
SJ**0 | ***0 | **0 | **0 | **0 | **0 | rubber track | **0 |
SJ**0 | ***0 | **0 | **0 | **0 | **0 | rubber track | **0 |
SJ**0 | ***0 | ***0 | ***0 | **0 | **0 | rubber track | ***0 |
SJ**0 | ***0 | ***0 | ***0 | **0 | **0 | rubber track | ********0 |
SJ**0 | ***0 | ***0 | ***0 | **0 | **0 | rubber track | ********0 |
SJ**0 | ***0 | ***0 | ***0 | **0 | **0 | rubber track | ********0 |
SJ**0A |
***0 | ***0 | ***0 | **0 | **0 | rubber track | ********0 |
SJ**0B | ***5 | ***0 | ***0 | **0 | **5 | steel track | ********0 |
SJ**0A | ***6 | ***6 | ***0 | **0 | **0 | rubber track | ********0 |
SJ**0B | ***0 | ***0 | ***0 | **0 | **0 | steel track | ********0 |
SJ**0A | ***0 | ***0 | ***0 | **0 | **5 | rubber track | ********0 |
SJ**0B | ***8 | ***1 | ***0 | **0 | **0 | steel track | ********0 |
SJ**0A | ***2 | ***2 | ***0 | **0 | **0 | rubber track | ********0 |
SJ**0B | ***5 | ***5 | ***0 | **0 | **0 | steel track | ********0 |
SJ**0A | ***0 | ***0 | ***0 | **0 | **0 | rubber track | ********0 |
SJ**0B | ***0 | ***0 | ***0 | **0 | **0 | steel track | ********0 |
SJ***0A | ***0 | ***2 | ***0 | **0 | **0 | rubber track | *********0 |
SJ***0B | ***0 | ***2 | ***0 | **0 | **0 | steel track | *********0 |
SJ***0A | ***0 | ***2 | ***0 | **0 | **0 | rubber track | **********0 |
SJ***0B | ***0 | ***2 | ***0 | **0 | **0 | steel track | **********0 |
SJ***0B | ***5 | ***0 | ***0 | **0 | **0 | steel track | **********0 |
SJ***0B | ***9 | ***0 | ***0 | **0 | **0 | steel track | **********0 |
SJ***0B | ***0 | ***0 | ***0 | **0 | **0 | steel track | **********0 |
SJ***0B | ***0 | ***0 | ***0 | **0 | **0 | steel track | **********0 |
SJ***0B | ***0 | ***0 | ***0 | **0 | **0 | steel track | **********0 |
SJ***0B | ***0 | ***0 | ***0 | **0 | ***0 | steel track | **********0 |
SJ****0B | ***0 | ***0 | ***0 | **0 | ***0 | steel track | ************0 |
SJ****0B | ***0 | ***0 | ***0 | **0 | ***0 | steel track | ************0 |
SJ****0B | ***0 | ***0 | ***0 | **0 | ***0 | steel track | ************0 |
Â
Steel track undercarriageOur track undercarriages are widely applied on the following machines
Drilling Class:  anchor drilling rig, water well drilling rig, core drilling rig, jet drilling rig, down-hole
drilling rig, hydraulic crawler drilling rig, for poling rig, multipurpose drilling rig, no-dig drilling rig, etc.
Construction machinery class:  mini excavator, mini pilling machine, aerial work platform, small transport loading equipment, etc.
Coal class:  slag-raking machine, tunnel drilling rig, hydraulic drilling machine, rock loading
machine, etc.
Mine
class:  mobile crusher, heading machine, conveying equipment, etc. Â
Othe class: fire fighting robot, underwater dredging equipment, sugar cane harvester, etc.
ÂÂ
ÂÂ
Pays: | China |
N ° de modèle: | SJ series |
Prix FOB: | 1500 ~ 25000 / Set ( Negotiable ) Obtenir le dernier prix |
Localité: | China |
Prix de commande minimale: | 1500 per Set |
Commande minimale: | 1 Set |
Packaging Detail: | Pallet or case on request |
Heure de livraison: | 15-35 days |
Capacité de Fournir: | 1000 Set per Year |
Payment Type: | T/T, L/C |
Groupe de produits : | steel track undercarriage |