Prix FOB
Obtenir le dernier prix|
1 Minimum Order
Pays:
China
N ° de modèle:
CP-GTF
Prix FOB:
Localité:
-
Prix de commande minimale:
-
Commande minimale:
1
Packaging Detail:
pallet
Heure de livraison:
1-2 DAYS
Capacité de Fournir:
5000 Piece per Week
Payment Type:
PayPal, T/T
Groupe de produits :
-
Personne à contacter Eline
Xiamen, Fujian
Introduction:
Our spiral pile is dry method not
using concrete.
It is possible to work on the soft ground without excavating work and removal og surplus soil.
Constructing dulation and cost cab be reduced due to dry methode with all-weather work.
It also contributes to the vitalization of construction business
for winter time.
Features:
1.reduce installation cost at worksite
2.deline labor cost
3.eco-friendly methord without concrete foundation
4.without excavating,no surplus soil
5.pulled out from soil easily
6.used for different places,even temporary structures
7.design avoiding underground utilities
Applied site:
1.solar farm
2.solar ground mount structure
3.wind power generation foundation
4.highway
5.park
6.street light
7.traffic light
8.temporary structure/house
9.wooden house
*0.Structure
base of electric power
*1.Transmitting
station foundation
*2.Vinyl
greenhouse base
*3.Anti-typhoon measure anchor
Pays: | China |
N ° de modèle: | CP-GTF |
Prix FOB: | Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | - |
Commande minimale: | 1 |
Packaging Detail: | pallet |
Heure de livraison: | 1-2 DAYS |
Capacité de Fournir: | 5000 Piece per Week |
Payment Type: | PayPal, T/T |
Groupe de produits : | - |