Prix FOB
Obtenir le dernier prix|
- Minimum Order
Pays:
China
N ° de modèle:
-
Prix FOB:
Localité:
-
Prix de commande minimale:
-
Commande minimale:
-
Packaging Detail:
For your Request
Heure de livraison:
30 days after the downpayment
Capacité de Fournir:
-
Payment Type:
-
Groupe de produits :
-
Personne àcontacter Ms. Deya
1389 Jinqiao Road, Shanghai, Shanghai, Shanghai
Working principle
The drive is on top of machine. Motor is run by gear box, to drive the main shaft. There are 3 or 4 rollers on main shaft. They are installed in conical inside liner, and run in revolution and rotation. The material is feed from top. With its own weight and thrust, it becomes into material deck. Grinding by roller again and again, it becomes into powder. The production is released from bottom. Through bucket elevator, it takes into powder separator. After separating, the fine powder is production. The coarse powder goes back into mill to regrind. In this case, the lifetime for ring and liner is much longer, bcos they do not touch each other. Its gap can be adjusted.
Conical mill adopts medium speed with medium pressure, continuous grinding. The material is feed from top and release from bottom. Grinding and separator is two step. Grinding liner, main mill shaft, spring , thickness of material deck can all be adjusted. Along with powder separator, it is very easy to adjust the producdtion size, and make the machine work well.
Working characteristic
Grinding characteristic **-Grind desulfitation limestone
After the first time grinding, most of production is powder. <1mm takes around *0%. After separation, it takes *1~*0.1mm. Regarding to different inquiry, this can be adjusted.
Bcos of special working principle, during grinding limestone, after several times grinding and curlating, internal stress of limestone is broken. There is many microcrack in limestone powder. Amount of porosity which is inside of the grain is increased. So that the specific surface is increased, the active of limestone powder is increased. This makes desulfitation become faster.
The production size is easy to adjusted. Most of grain is collected around D*0. It fit for CFB boiler enquiry.
Technical parameter :
Model | JYM***5 | JYM***5 | JYM***5 |
capacity(t/h) | ****0 | ****5 | ***0 |
Feed in size(mm) | <*0 | <*5 | <*0 |
Production size(mm) | **5 | **5 | **5 |
Power(kw) | **0 | **5 | **0 |
Dimension(m) | φ3.1X4.8 | φ4.1X5.1 | φ5.1X5.5 |
Pays: | China |
N ° de modèle: | - |
Prix FOB: | Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | - |
Commande minimale: | - |
Packaging Detail: | For your Request |
Heure de livraison: | 30 days after the downpayment |
Capacité de Fournir: | - |
Payment Type: | - |
Groupe de produits : | - |