Prix FOB
Obtenir le dernier prix( Negotiable )
|- Minimum Order
Pays:
China
N ° de modèle:
-
Prix FOB:
( Negotiable )Obtenir le dernier prix
Localité:
-
Prix de commande minimale:
-
Commande minimale:
-
Packaging Detail:
According Clients's Required for Concrete Pump Elbow
Heure de livraison:
10 working days after received your payment
Capacité de Fournir:
-
Payment Type:
T/T, L/C
Groupe de produits :
-
Personne àcontacter Zhang
Jinan, Shandong
Specifications:
Concrete pump elbow for boom pump, trailer pump, stationary pump, truck mounted pump
Twin wall elbow s service life and working pressure are better than the casting.Â
Â
1. Twin wall elbow s service life and working pressure are better than the casting. Besides, The Twin wall elbows structure ensures high abrasion resistance and toughness.
2. Chromium alloy iron casting enables the liner highly wear proof and reduce pressure
3. Seamless welding enables the the outer layer hard to explode
4. Light weight improves vehicle efficiency, highly reduces labor and cost and the time for replacement
5. Designed structure, material and process realize its **5 times service life of common products
6. to extend the service life of other pipe fitting
7. Easy to use and handle
Â
Product Name: | Concrete pump elbow |
Material: | High Manganese |
Degree: | *0d,*5d,*0d,*0d,*5d,*0d etc |
Model: | DN**0(4),DN**5(5''),DN**0,DN**5 |
Inter wall thickness: | 8mm |
Outer wall thickness: | 3mm |
Application: | All kinds of concrete pump |
Others: | As per your request |
Â
Description:
Â
Type |
Single elbow | Twin wall elbow |
Modle |
DN**5 (5) |
DN**5 (5) |
SIZE Â |
R**5**0D Â |
R**5**0D Â |
SIZE |
R**5**5D Â |
R**5**5D Â |
SIZE |
R**5**0D Â |
R**5**0D |
SIZE |
R**5**5D Â |
R**5**5D Â |
SIZE |
R**5**0D Â |
R**5**0D Â |
SIZE |
R**5**5D Â |
R**5**5D Â |
SIZE |
R**5**0D Â |
R**5**0D Â |
Pays: | China |
N ° de modèle: | - |
Prix FOB: | ( Negotiable ) Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | - |
Commande minimale: | - |
Packaging Detail: | According Clients's Required for Concrete Pump Elbow |
Heure de livraison: | 10 working days after received your payment |
Capacité de Fournir: | - |
Payment Type: | T/T, L/C |
Groupe de produits : | - |