Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs. Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Composite Pipes
Next

Composite Pipes

( Negotiable )

|

- Minimum Order

Pays:

China

N ° de modèle:

double metal composite pipes -Clad pipe

Prix FOB:

( Negotiable ) Obtenir le dernier prix

Localité:

-

Prix de commande minimale:

-

Commande minimale:

-

Packaging Detail:

Wooden case or normal export packaging

Heure de livraison:

Within 40- 60 days

Capacité de Fournir:

-

Payment Type:

Other, PayPal, Money Gram, Western Union, D/P, L/C, T/T

Groupe de produits :

Contacter maintenant
Membre gratuit

Personne à contacter Ms. Iren

F14/A,NO.618 XiKang Rd, JingAn District Shanghai, Shanghai, Shanghai

Contacter maintenant

La description

 

Introduction:metallurgy composite, centrifugal casting+ extrusion (or extrusion + cold rolling)
Adopting Electric furnace +vacuum degassing + centrifugal casting, ***0 tons extrusion mill Extrusion Unit Three-extrusion Moulding ,Normal temperature and high temperature electric tensile mill,Swiss ARL more matrix spectrum analyzer. Metallurgical detection , ONH***0 gas analysis instrument imported from Germany and etc.
Application:Oilfield、natural gas pipe line, Chemical industry and etc.
Normal grade: Basic layer are carbon structure steel/ alloy structure steel (N*0、L*0、P**0、X*0、L**0NCS ) and etc. Clad metal are **4L,**6L,***5, Incoloy**5, G3, Inconel**0, S****3 and etc. And we can composite other material according to the requirements of clients.
Standard: API 5L/5LD or the technical agreements.
Hot extruded composite tube
O.D.:Ø*6~Ø**9     
W.T.:6~*0mm   
L. :2~*0m
Finish rolling composite tube
O.D.:Ø*5~Ø**9     
W.T.:2.5~*0mm 
L.:4~*2m

Pays: China
N ° de modèle: double metal composite pipes -Clad pipe
Prix FOB: ( Negotiable ) Obtenir le dernier prix
Localité: -
Prix de commande minimale: -
Commande minimale: -
Packaging Detail: Wooden case or normal export packaging
Heure de livraison: Within 40- 60 days
Capacité de Fournir: -
Payment Type: Other, PayPal, Money Gram, Western Union, D/P, L/C, T/T
Groupe de produits : double metal composite tubes

Send a direct inquiry to this supplier

To:

Ms. Iren < Shanghai best alloy co., ltd. >

Je veux savoir: