Prix FOB
Obtenir le dernier prix28000 ~ 32000 USD / Unit
|1 Unit Minimum Order
Pays:
China
N ° de modèle:
CLW5161GSS3
Prix FOB:
28000 ~ 32000 USD / Unit Obtenir le dernier prix
Localité:
China
Prix de commande minimale:
28000 per Unit
Commande minimale:
1 Unit
Packaging Detail:
naked packing
Heure de livraison:
15 days
Capacité de Fournir:
3 Unit per Week
Payment Type:
T/T, L/C
Groupe de produits :
-
Personne àcontacter Hedy
Suizhou, Hubei
water tank production:
Our automatic assembly line into the water tank production process: cutting, jigsaw automatic welding, head spinning, roll forming a tank and other domestic advanced production technology. Multi-use high-quality carbon steel tank material plate production. Special use cases, according to the needs of customers Korea imported **4 stainless steel. Tank volume of "4 cube, cube 5, 6 cubic, 8 cube, *0 cube, *3 cube, *5 cube. *0 cube ."
pipeline systems of the water truck:
water truck pipes, valves, filtration devices, the outlet (forward setting sprinkle, side spray; high side of the shower; after the work platform, with a green watering anti-aircraft guns).
the operating system of the water truck:
the water truck is mainly driven by the engine gearbox, gearbox installed drive power take shower pumps, shower pumps generate momentum within the tank of liquid sprayed out through the pipe network.
Scope of work: self-priming height: ≤ 7m,
sprinkler width: ≥ *4m,
maximum range: ≥ *8m; can be adjusted into a column,
a range of ≥ *8m; also can be adjusted into a mist, a range of ≥ *5m.
Pays: | China |
N ° de modèle: | CLW5161GSS3 |
Prix FOB: | 28000 ~ 32000 / Unit Obtenir le dernier prix |
Localité: | China |
Prix de commande minimale: | 28000 per Unit |
Commande minimale: | 1 Unit |
Packaging Detail: | naked packing |
Heure de livraison: | 15 days |
Capacité de Fournir: | 3 Unit per Week |
Payment Type: | T/T, L/C |
Groupe de produits : | - |